My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotations - Studebaker Museum Skylight Replacement Proj No 124-019 - Shaffner
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Quotations/Proposals
>
Opening of Quotations - Studebaker Museum Skylight Replacement Proj No 124-019 - Shaffner
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2024 3:45:10 PM
Creation date
11/12/2024 3:44:51 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/12/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CITY OF SOUTH BEND <br />STUDEBAKER NATIONAL MUSEUM <br />SKYLIGHT REPLACEMENT CONTRACT CLOSEOUT 01700-2 <br />b. Re-inspection Procedures: The Architect will re-inspect the work upon receipt of the <br />above items. Upon completion of re-inspection, the Architect will prepare a <br />Certificate of Final Acceptance or advise the Contractor of work that is incomplete <br />and required before final acceptance can be issued. <br /> <br />4. Correction Period Walk-Thru: <br /> <br />a. One (1) week after the date of Completion, coordinate a Project Walk-Thru with the <br />Owner and Architect to review Project in regard to work that is defective or that does <br />not conform to the Contract Documents. <br /> <br />b. Architect will prepare a Correction List of items to be corrected or replaced prior to <br />expiration of any warranties. <br /> <br />c. Contractor shall promptly correct work indicated on Correction List and submit <br />written notice to the Architect that the Correction List items have been completed. <br /> <br />5. Record Documents: Provide record documents as specified in Section 01720 “Project <br />Record Documents”. <br /> <br />B. Products (Not Used) <br /> <br />C. Execution <br /> <br />1. Final Cleaning: <br /> <br />a. General cleaning during construction is required, as defined in the General <br />Conditions, and as described elsewhere in the Specifications. <br /> <br />b. Final cleaning shall be as described in Section 01710 “Cleaning”. <br /> <br /> <br /> <br /> <br />END OF SECTION 01700 <br />
The URL can be used to link to this page
Your browser does not support the video tag.