My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotations - Studebaker Museum Skylight Replacement Proj No 124-019 - Shaffner
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Quotations/Proposals
>
Opening of Quotations - Studebaker Museum Skylight Replacement Proj No 124-019 - Shaffner
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2024 3:45:10 PM
Creation date
11/12/2024 3:44:51 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/12/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CITY OF SOUTH BEND <br />STUDEBAKER NATIONAL MUSEUM <br />SKYLIGHT REPLACEMENT PROJECT COORDINATION 01040-3 <br />e. Installing entities shall modify installations to eliminate conflicts and achieve <br />coordination of systems and Work. <br /> <br />f. If Field Coordination Drawings indicate conflicts, which cannot be reconciled <br />without modifying space or design provisions, Architect’s field representative <br />shall review coordination drawings to determine if field modifications are <br />required. <br /> <br />g. Failure to exercise field coordination responsibility waives Contractor’s claims for <br />an increase in Contract Sum if design modifications are required to resolve <br />conflicts that might have been avoided by complying with requirements of this <br />Section. <br /> <br />7. Administrative and Supervisory Personnel: <br /> <br />a. In addition to its Project Superintendent, the contractor shall provide other <br />administrative and supervisory personnel required for proper performance of the <br />Work. <br />1) The Project Superintendents must be on site full time during normal <br />working hours. The Superintendent shall not be changed without the <br />Owners and the Century Center Director of Operations approval. <br />2) The Superintendents shall prepare, and keep on site, a daily log that <br />describes construction activities, site visits by regulatory officials, <br />vendors etc. <br /> <br />b. The Contractor shall provide a full-time Project Coordinator, experienced in <br />administration and supervision of building construction, including mechanical and <br />electrical work. This Project Coordinator shall be authorized to act as the <br />coordinator of construction activities between each subcontractor. <br />1) Construction activities requiring coordination by the Project Coordinator <br />shall include, but not be limited to, the following: <br />a) Scheduling and sequencing the Work. <br />b) Sharing access to work spaces. <br />c) Installations. <br />d) Protection of the Work of each Prime Contractor. <br />e) Cutting and patching. <br />f) Temporary services and facilities. <br />g) Inspections and tests. <br /> <br />8. Coordination of Contract Closeout: <br /> <br />a. Contractor shall coordinate completion and clean up of Work with each of the <br />separate subcontractors to include: <br />1) Coordinating access to Project for correction of defective Work. <br />2) Assembling and coordinating closeout submittals specified in section <br />01700 “Contract Closeout”. <br /> <br /> <br /> <br />END OF SECTION 01040
The URL can be used to link to this page
Your browser does not support the video tag.