Laserfiche WebLink
A5: The conversion of the existing parking spaces to the electric vehicle parking spaces as <br />schematically designed in Attachment 1 will require some of the existing lines to be ground <br />off. This cost will be incidental to the cost of striping for each division. Where new lines <br />coincide with old lines, new lines may be placed on top of old lines. <br />Q6: Also, I do not see a size called out for the ESVE Pavement Marking Symbol item. Can this <br />be clarified? <br />A6: The EVSE Pavement Marking Symbol should be a 48" square. <br />PART 2 — PROJECT SPECIFICATIONS <br />1.02 Section XX PAYROLL RECORDS, B. Additions <br />ADD to B.1 <br />Please provide the prevailing wage rate. Please note that the rate can be found here <br />(SAM.gov). <br />Please also list the number of laborers employed. Please note that any contractor or <br />subcontractor that employs four or more laborers or mechanics in the construction, <br />alteration, or repair of the facility must also hire at least one qualified apprentice. <br />Additional information on prevailing wage and apprenticeship requirements can be found <br />with this link. <br />