Laserfiche WebLink
BID/PROPOSAL 41 " <br />CITY OF SOUTH BEND <br />J' M65 <br />PROJECT NAME: 2024 Community Crossings Round 2 <br />PROJECT NO. 124-047 <br />FOR BIDS DUE: November 12, 2024, 9:00 a.m <br />CONTRACTOR NAME: Milestone Contractors, L.P. <br />2024 COMMUNITY CROSSINGS ROUND 2 <br />DIVISION 4: S. LEE COURT FROM FAIRVIEW AVE TO CUL-DE-SAC <br />ITEM <br />NO. <br />DESCRIPTION <br />QUANTITY _ <br />UNIT <br />UNIT PRICE <br />TOTAL AMOUNT <br />1 <br />Maintenance of Traffic <br />1 <br />LS <br />3,800.00 <br />$3,800.00 <br />2 <br />Mobilization and Demobilization <br />1 <br />LS <br />4,600.00 <br />$4,600.00 <br />3 <br />Construction Engineering (1.5%) <br />1 <br />LS <br />1,436.60 <br />$1,436.60 <br />4 <br />Excavation, Common <br />408 <br />CYS <br />70.00 <br />$28,560.00 <br />5 <br />Subgrade Treatment Type II <br />1048 <br />SYS <br />10.30 <br />$10,794.40 <br />6 <br />HMA Surface Type B <br />86 <br />TON <br />123.00 <br />$10,578.00 <br />7 <br />HMA Intermediate, Type B <br />144 <br />TON <br />101.00 <br />$14,544.00 <br />8 <br />HMA Base, Type B <br />231 <br />TON <br />92.00 <br />$21,252.00 <br />9 <br />Tack Coat <br />1 <br />TON <br />1.00 <br />$1.00 <br />10 <br />Joint Adhesive, Surface <br />266 <br />LFT <br />1.00 <br />$266.00 <br />11 <br />Joint Adhesive, Intermediate <br />266 <br />LIFT <br />1.00 <br />$266.00 <br />12 <br />PCCP for Approaches, 6 in. <br />52 <br />SYS <br />183.00 <br />$9,516.00 <br />13 <br />Manhole, Structure Adjustment <br />1 <br />EA <br />1,100.00 <br />$1,100.00 <br />14 <br />Water Valve, Structure Adjustment <br />1 <br />EA <br />280.00 <br />$280.00 <br />15 <br />Inlet, 310 <br />1 <br />EA <br />4,500.00 <br />$4,500.00 <br />16 <br />Sidewalk, Concrete <br />180 <br />SYS <br />124.00 <br />$22,320.00 <br />17 <br />Curb Ramp, Concrete <br />13 <br />SYS <br />440.00 <br />$5,720.00 <br />18 <br />Curb and Gutter, Type B, Concrete <br />550 <br />LFT <br />55.00 <br />$30,250.00 <br />19 <br />Sodding, Nursery <br />106 <br />SYS <br />45.00 <br />$4,770.00 <br />20 <br />Topsoil <br />12 <br />CYS <br />75.00 <br />$900.00 <br />21 <br />Mailbox Assembly, Reset Single <br />6 <br />EA <br />250.00 <br />$1,500.00 <br />