Laserfiche WebLink
BID/PROPOSAL F� <br />CITY OF SOUTH BEND ' <br />PROJECT NAME: 2024 Community Crossings Round 2 <br />PROJECT NO. 124-047 <br />FOR BIDS DUE: November 12, 2024, 9:00 a.m <br />CONTRACTOR NAME: Milestone Contractors, L.P. <br />ITEM <br />NO. <br />DESCRIPTION <br />QUANTITY <br />UNIT <br />UNIT PRICE ` <br />TOTAL AMOUNT <br />3 <br />Construction Engineering (1.5%) <br />1 <br />LS <br />1,424.40 <br />$1,424.40 <br />4 <br />Excavation, Common <br />451 <br />CYS <br />66.00 <br />$29,766.00 <br />5 <br />Subgrade Treatment Type II <br />1159 <br />SYS <br />10.40 <br />$12,053.60 <br />6 <br />HMA Surface Type B <br />96 <br />TON <br />117.00 <br />$11,232.00 <br />7 <br />HMA Intermediate, Type B <br />159 <br />TON <br />98.00 <br />$15,582.00 <br />8 <br />HMA Base, Type B <br />255 <br />TON <br />89.00 <br />$22,695.00 <br />9 <br />Tack Coat <br />1 <br />TON <br />1.00 <br />$1.00 <br />10 <br />Joint Adhesive, Surface <br />299 <br />LFT <br />1.00 <br />$299.00 <br />11 <br />Joint Adhesive, Intermediate <br />299 <br />LIFT <br />1.00 <br />$299.00 <br />12 <br />PCCP for Approaches, 6 in. <br />68 <br />SYS <br />183.00 <br />$12,444.00 <br />13 <br />Manhole, Structure Adjustment <br />1 <br />EA <br />1,100.00 <br />$1,100.00 <br />14 <br />Water Valve, Structure Adjustment <br />1 <br />EA <br />280.00 <br />$280.00 <br />15 <br />Inlet,110 <br />1 <br />EA <br />4,300.00 <br />$4,300.00 <br />16 <br />Pipe, Type 2, Circular, 12 in. <br />247 <br />LIFT <br />64.00 <br />$15,808.00 <br />17 <br />Sidewalk, Concrete <br />174 <br />SYS <br />120.00 <br />$20,880.00 <br />18 <br />Curb Ramp, Concrete <br />it <br />SYS <br />500.00 <br />$5,500.00 <br />19 <br />Curb and Gutter, Type B, Concrete <br />692 <br />LFT <br />48.00 <br />$33,216.00 <br />20 <br />Sodding, Nursery <br />109 <br />SYS <br />44.00 <br />$4,796.00 <br />21 <br />Topsoil <br />12 <br />CYS <br />75.00 <br />$900.00 <br />22 <br />Mailbox Assembly, Reset Single <br />7 <br />EA <br />250.00 <br />$1,750.00 <br />23 <br />Inspection Hole, Deeper than 3-ft <br />6 <br />EA <br />1,270.00 <br />$7,620.00 <br />24 <br />Inspection Hole, 3-ft Deep or Less <br />10 <br />EA <br />805.00 <br />$8,050.00 <br />25 <br />Inlet, C15 <br />3 <br />EA <br />4,600.00 <br />$13,800.00 <br />DIVISION 3 TOTAL <br />$235,096.00 <br />