My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - SB City Hall Renovations Proj No. 124-001 -Michuda-Cruz JV
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Bids
>
Opening of Bids - SB City Hall Renovations Proj No. 124-001 -Michuda-Cruz JV
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 1:58:53 PM
Creation date
10/24/2024 12:42:52 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
10/22/2024
Callout
ID:
1
Creator:
Created:
10/24/2024 12:43 PM
Modified:
10/24/2024 12:43 PM
Text:
Create barrier between construction and cafe space
Polygon
ID:
1
Creator:
Created:
10/24/2024 12:43 PM
Modified:
10/24/2024 12:43 PM
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
995533355311111111147511EX. STAIREX. MENSEX. STAIREX. HKEX.WOMENSSTORAGECAFEOFFICESTORAGEOFFICEOFFICEOFFICEOFFICEOFFICEOPENOFFICECONFERENCERECEPTIONVENDINGVENDINGMECHCONFERENCEHALLA/VUP5121211222212111144111111991111NOT IN SCOPE OF WORK9' - 0 3/16"9' - 9 5/8"9' - 1 9/16"9' - 11 9/16"11' - 1 3/8"4' - 9 11/16"11104141111810STORAGECOUNCILCHAMBERS22222424242433213318331933083320332233143323331117311933103314330535251411111212191920274A. REMOVE EXISTING FLOOR, WALL, & WALL BASE MATERIALS IN ALL AREAS SCHEDULED TO RECEIVE NEW FLOOR, PAINT, & BASE, U.N.O. REMOVE ALL FLOOR, WALL, & WALL BASE ADHESIVES OR MORTAR COMPLETE & PREPARE SURFACES AS REQUIRED TO RECEIVE NEW FINISHES. REFER TO FINISH DRAWINGS & LEGEND.B. SALVAGE EXISTING CEILING TILE & GRID TO BE REUSED IN NEW CONSTRUCTION U.N.O. C. ROOMS DEPICTED IN GRAY ARE TO REMAIN AND ARE NOT IN THE DEMO SCOPE.D. REMOVE ALL CHAIR RAIL AND / OR WAINSCOTING U.N.O. PREPARE SURFACES AS REQUIRED TO RECEIVE NEW FINISHES. REFER TO FINISH DRAWINGS & LEGEND.E. REMOVE ALL SIGNAGE AND REPAIR WALL TO MATCH ADJACENT CONSTRUCTION AS NEEDED.F. DOORS NOTED WITH A NOTE '3' AND A DOOR TAG SHALL BE REMOVED (INCLUDING DOOR HARDWARE), SALVAGED, AND REINSTALLED AT THE LOCATION NOTED IN THE DOOR TAG. PROTECT DOORS DURING CONSTRUCTION ACTIVITIES. REPAIR DAMAGE TO DOORS PRIOR TO REINSTALLATION.G. FINISHED COLUMN ENCLOSURES TO REMAIN U.N.O. PATCH AS NEEDED.H. REMOVE VINYL WALLCOVERING IN ALL AFFECTED AREAS.I. CONTRACTOR TO ASSUME51% SALVAGED WHOLE TILES TO BE REUSED.Project NumberCERTIFIED BYISSUANCE INDEXDATE:PROJECT PHASE:9/6/2024 6:22:26 PMD103THIRD FLOORDEMOLITION PLAN2022.0034309/06/2024BID DOCUMENTSSOUTH BEND CITY HALLRENOVATION215 DR. M.L.K. JR BLVD.SOUTH BEND, IN 46601N3/16" = 1'-0"D1031THIRD FLOOR DEMOLTION PLAN1 DEMOLISH WALL IN ENTIRETY. PATCH AND REPAIR CONCRETE SLAB W/ FLOORING MATERIAL FLUSH W/ ADJACENT FLOOR.PATCH AND REPAIR EXISTING WALL(S) WHERE APPLICABLE TO MATCH SURROUNDING FINISH AND MATERIALS PER NEWWORK PLANS.2 DEMOLISH PORTION OF EXISTING WALL TO EXTENTS SHOWN. REFERENCE NEW WORK PLANS.3 REMOVE WINDOW / DOOR, FRAME AND HARDWARE IN THEIR ENTIRETY. SALVAGE DOORS AS PER DOOR COORD. NOTES.SEE A6014 REMOVE CASEWORK AND HARDWARE IN THEIR ENTIRETY. SALVAGE CASEWORK AS REQUIRED BY OWNER.5 REMOVE DOOR, FRAME, AND HARDWARE IN ENTIRETY6 REMOVE RAMP & RAISED ACCESS FLOOR IN ENTIRETY7 REMOVE PLUMBING FIXTURES & ACCESSORIES IN THEIR ENTIRETY. SALVAGE ACCESSORIES AS REQUIRED BY OWNER. CAPSUPPLY AND SANITARY LINES AS INDICATED IN THE PLUMBING DWGS.8 REMOVE WINDOW / PASS THROUGH COMPLETE.9 REMOVE DEMOUNTABLE PARTITION AND HARDWARE COMPLETE.10 REMOVE ALL FOOD SERVICE EQUIPMENT. SALVAGE AS REQUIRED BY OWNER.11 REMOVE AUDIO VISUAL EQUIPMENT AS INDICATED IN THE LOW VOLTAGE DWGS.. SALVAGE AS REQUIRED BY OWNER.12 REMOVE MEP EQUIPMENT PER MEP PLANS. SALVAGE AS REQUIRED BY OWNER.13 REMOVE ALL CEILING TILES AND GRID IN ENTIRETY14 REMOVE GYPSUM CEILING IN ENTIRETY. PATCH ADJACENT EXISTING WALLS TO REMAIN AS NEEDED FOR FINAL FINISHEDLOOK15 REMOVE AND SALVAGE EXISTING ACOUSTIC CEILING TILE FOR REUSE. REFER TO NEW WORK PLANS FOR REINSTALLATIONLAYOUTS16 REMOVE EXPOSED CABLE TRAY IN ENTIRETY. SALVAGE AS REQUIRED BY OWNER.17 REMOVE DOOR ONLY. FRAME AND STRIKE PLATE TO REMAIN. PREP FOR NEW DOOR INSTALLATION18 REMOVE WALL FRAMING AND PANELS AT VACATED IT RACK LOCATIONS19 REMOVE VINYL WALLCOVERING AND PREP WALL FOR PATCH AS NEEDED THROUGHOUT SPACE20 REMOVE PLASTIC LAMINATE ELEVATOR VENEER AND WOOD EYEBROW COMPLETE. PREP SURFACES FOR NEW FINISHINSTALLATION.21 REMOVE EXISTING BULKHEAD IN ENTIRETY AND PATCH WALLS WHERE NEEDE FOR COMPLETE FINISHED LOOK.22 ANTICIPATED AREA OF SLAB REMOVAL FOR PLUMBING DRAIN LOCATIONS. COORDINATE WITH NEW WORK PLANS ANDPLUMBING DRAWINGS23 ANTICIPATED PATH OF SLAB DEMOLITION FOR PLUMBING INSTALLATION. COORDINATE WITH NEW WORK PLANS ANDPLUMBING DRAWINGS24 REMOVE EXISTING WAINSCOTING / CHAIR RAIL AS NEEDED ON ENTIRE COLUMN. SALVAGE, REINSTALL, PRIME AND PREP TORECEIVE NEW PAINT.25 REMOVE FLOOR TILE ASSEMBLY IN FULL DOWN TO THE TOP OF SLAB THROUGHOUT SPACE.26 SALVAGE GRANITE SEAL AT RECEPTION DESK AND COORDINATE WITH OWNER27 SALVAGE GRANITE COUNTERTOP AND COORDINATE WITH OWNER28 SALVAGE EXISTING DEDICATION PLAQUE AND RETURN TO OWNERKEYED DEMO PLAN NOTES xGENERAL DEMOLITION NOTESREVISION SCHEDULENO. DESCRIPTION DATE
The URL can be used to link to this page
Your browser does not support the video tag.