Laserfiche WebLink
4. Removal of parking bumpers shown in Attachment 1 will not be paid directly but shall be included <br />in the cost of the concrete sidewalk. <br />5. Precise removal limits shall be coordinated with the City. The cost of hauling of materials offsite <br />shall not be paid for separately but included in the cost of Concrete Sidewalk and Curb Ramp <br />construction. <br />6. Concrete or other items outside the removal limits damaged by the Contractor or any <br />subcontractors during the removal process will be repaired or replaced to the satisfaction of the <br />Engineer at no additional cost. <br />7. Saw cuts required for removal shall not be paid for separately but included in the cost of the <br />Concrete Sidewalk installation. <br />8. Payment shall be made at the Unit Price as specified in the proposal as follows: <br />SIDEWALK. CONCRETE. 4 in. <br />XXIV. PLANS <br />A. Prevailing Specifications: City of South Bend Design and Construction Standards <br />B. Additions: <br />SYD <br />1. The plans consist of Sheets. <br />2. The work shall conform to the plans. <br />3. The drawings are schematic in nature. <br />4. The CONTRACTOR is responsible for estimating dimensions and quantities of materials. <br />5. In the event that the Special Provisions and the Plans conflict, the Special Provisions shall govern. <br />IV. M/WBE GOALS <br />A. Prevailing Specifications: City of South Bend Ordinance No. 10761-21, Minority and Women <br />Business Enterprise Inclusion Program Plan <br />B. Additions: <br />1. The M/WBE Goals for this Project are: <br />Division 1 <br />a. MBE: 1.59 %. <br />b. WBE: 4.46 %. <br />Division 2 <br />a. MBE: 1.47 %. <br />b. WBE: 4.41 %. <br />Division 3 <br />a. MBE: 1.47 %. <br />b. WBE: 4.41 %. <br />Division 4 <br />a. MBE: 4.3 %. <br />b. WBE: 6.1 %. <br />Total Project Goals (All Divisions) <br />a. MBE: 1.8 %. <br />b. WBE: 4.59 %. <br />Version 3/15/2024 Page - 9 Public Works Quote <br />