My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - On-Call Design - McCormick Engineering LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
PSA - On-Call Design - McCormick Engineering LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 4:08:23 PM
Creation date
10/22/2024 2:17:53 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
10/22/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit A- Engineer's Services <br />Preliminary Design Phase- (All Prime Construction Contracts) <br />MCCORMICK will perform the following tasks to complete the noted work for both Prime Contracts: <br />Prepare outline specifications, opinion of probable Construction Cost and other documents outlined in <br />Section A1.02 of the Contract. <br />Final Design Phase — (Harrow Drive Prime Construction Contract) <br />MCCORMICK will perform the following tasks to complete the noted work for the noted Prime Contract: <br />Prepare final Drawings and Specifications and other documents outlined in Section A1.03 of the <br />Contract. <br />Bidding and Negotiating Phase — (Harrow Drive Prime Construction Contract) <br />MCCORMICK will perform the following tasks to complete the noted work for the noted Prime Contract: <br />Assist Owner in the solicitation and negotiation of Bids outlined in Section A1.04 of the Contract. <br />Construction Phase — (Harrow Drive Prime Construction Contract) <br />MCCORMICK will perform the following tasks to complete the noted work for the noted Prime Contract: <br />Unless otherwise agreed by the Owner and Engineer, the Engineer services during the Construction <br />phase shall be limited to the work noted in Section A1.05.A of the Contract. <br />Post Construction Phase — (Harrow Drive Prime Construction Contract) <br />MCCORMICK will perform the following tasks in order to complete the noted work for the noted Prime <br />Contract: Unless otherwise agreed by the Owner and Engineer, the Engineer services during the <br />Construction phase shall be limited to the work noted in Section A1.06 of the Contract. <br />Exclusions <br />This Contract does not include fees or provisions for Right -of -Way acquisition services. Such services <br />would require an amendment to the Contract if needed. Services beyond the Preliminary Design Phase <br />are not included for the Calvert Street or Pershing Street Contracts at this time but could be added later <br />by amendment to the Contract. <br />2025 Storm water On -Call Services Project - Scope of Services <br />Page 14 of 14 <br />(Exhibit A- Engineer's Services) <br />
The URL can be used to link to this page
Your browser does not support the video tag.