My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Traffic Signal at Portage Ave. and Cleveland Rd. – Jones Petrie Rafinski Corp.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Traffic Signal at Portage Ave. and Cleveland Rd. – Jones Petrie Rafinski Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 4:12:48 PM
Creation date
8/13/2024 2:06:05 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/13/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is EXHIBIT A, consisting of 3 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated , <br />Engineer's Services <br />Article 1 of the Agreement is supplemented to include the following agreement of the parties. <br />Engineer shall provide Basic and Additional Services as set forth below regardomg the proposed traffic <br />signal system and intersection improvements at the intersection of Cleveland Road and Portage Avenue in <br />South Bend, Indiana. <br />PART 1 — BASIC SERVICES <br />A1.01 Topographic Survey <br />A. Engineer shall: <br />Perform topographic survey of the understood project limits area following the performing <br />of 811 utility coordination so that existing buried utility locations can be timely and <br />accurately marked by the affected utilities and surveyed by the Engineer for including in <br />the topographic survey drawing. <br />2. Coordinate with the City of South Bend Traffic Signal Department so that existing buried <br />traffic signal facility locations can be timely and accurately marked by the City and <br />surveyed by the Engineer for including in the topographic survey drawing. <br />A 1.02 Design <br />A. Engineer shall: <br />1. Perform an engineering field check of the project limits area. <br />2. Prepare the design of a certified construction project bid package including a plan drawing <br />set and a specifications/contract document in City of South Bend Engineering format. <br />3. Prepare an itemized Engineer's cost estimate. <br />4. The design is to include the replacement of the existing in -pavement traffic signal detection <br />system with a 2-camera hemispherical "Gridsmart" traffic signal detection system and <br />replacement of existing signal detection equipment in the signal controller cabinet with the <br />necessary "Gridsmart" system equipment. <br />5. The design is to include replacement of existing traffic signal heads, pedestrian push button <br />assemblies, traffic signage, and traffic signal system cables with new traffic signal features <br />according to current City of South Bend Standards. <br />6. The design is to include improvements for pedestrian functionality including ADA <br />Compliant sidewalk and crosswalk features. <br />Page 1 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.