Laserfiche WebLink
DRAFTClient:City of South Bend <br />Project Name:Miami Road & Lincoln Way East Intersection Improvements <br />South Bend Project No.:123-078 <br />Manhour Justification Principle Sr. PMSr PEngrSr Designer/ Sr SurveyorEngineer/DesignerTechnician Admin2 Person Survey Crew1 Person Survey Crew Total Hrs Total FeeTask Description <br />Task 2 60% Preliminary Design Plans / Submission 4 49 57 34 128 0 0 0 0 272 36,400$ <br />26 Title Sheet/1 sht 2 240$ <br />27 Finalize Index Sheet with Pertinent Utility Information/1 sht 2 240$ <br />28 Demolition Plan and Quantities/2 Sht 2 4 740$ <br />29 Preliminary Typical Cross Sections - 1 sht 2 240$ <br />30 Prel. Maint of Traffic - 4 Phases max (1" = 50') incl Detour / 4 Shts <br />w/Summary 8 16 2,960$ <br />31 Prel Plan and Profile (1" = 20') / 3 Shts 4 8 1,480$ <br />32 Signal Plan / 1 Sht 4 4 8 2,240$ <br />33 Traffic Contol Plans and Signage w/Summary/ 1 Sht 2 4 740$ <br />34 Lighting Design / Subconsultant Scheele Engg 57 8,265$ <br />35 Coordination with Lighting Consultant Scheele 2 2 550$ <br />36a Lighting Plan and Details/ 2 Shts 2 8 1,220$ <br />36b Landscape Plan and Details/ 1 Sht 2 4 740$ <br />37 Erosion Control Plans (1"= 40') / 1Plan+ 1detail Sht 2 8 1,220$ <br />38 Pavement Marking and Signage Plan and Summary Sheet/ 1 Sht 2 4 740$ <br />39 Ramp Design and details / 1 Sht 2 8 1,220$ <br />40 Cross-Section Sheets/ 12 Shts 1 4 8 1,635$ <br />41 Details Sheet 2 6 1,030$ <br />42 Qty Calcs and Cost Estimate 4 480$ <br />43 Specifications 24 3,720$ <br />44 QA/QC time 8 4 1,720$ <br />45 Utility Coordination 8 960$ <br />46 CSGP Permit Application 4 480$ <br />47 City and INDOT review / Site Visit 8 8 2,200$ <br />48 Compliance of City and INDOT review at 60% 4 6 1,340$ <br />2 of 5