My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - LW E. & Miami Intersection Imprvmnts. Proj No. 123-078 – A&Z Engineering, LLC - TABLED
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
PSA - LW E. & Miami Intersection Imprvmnts. Proj No. 123-078 – A&Z Engineering, LLC - TABLED
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2024 2:05:47 PM
Creation date
8/13/2024 2:05:32 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/13/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DRAFTClient:City of South Bend <br />Project Name:Miami Road & Lincoln Way East Intersection Improvements <br />South Bend Project No.:123-078 <br />Manhour Justification Principle Sr. PMSr PEngrSr Designer/ Sr SurveyorEngineer/DesignerTechnician Admin2 Person Survey Crew1 Person Survey Crew Total Hrs Total FeeTask Description <br />Task 1 30% Preliminary Design Plans / Submission 8 81 44 229 184 12 2 10 60 630 83,515$ <br />Topographic Survey and Drawing -$ <br />1a Survey notices, records research, 811 locates, 6 2 950$ <br />1b Set Benchmarks, Horz Control, Level Circuit, Structure Data 10 1,800$ <br />1c Site topo survey and data collection, property corners recon 30 4,050$ <br />2a Data processing, cleanup, prop lines, r/w 8 1,040$ <br />2b Existing pipe network, topo cleanup 8 1,040$ <br />Project Cost Analysis -$ <br />3 Cost of Path fully replaced 2 2 16 2,490$ <br />4 Cost of Gaps to be filled with path 2 2 500$ <br />5 Cost of Gap to be filled and replace dangerous sections 2 4 740$ <br />Traffic Study -$ <br />6 Coordination with INDOT LaPorte District and City 4 620$ <br />7 Traffic Consultant SEH Traffic Analysis 40 40 11,000$ <br />Geotechnical Investigations -$ <br />8 Pavement Cores (2)4 4 12 2,240$ <br />Plan Drawings - 30% Plan Set -$ <br />9 Facilitate Kick-off mtg with INDOT and Stakeholders 4 4 4 1,620$ <br />10 Demolition Plan/2 Sht 2 4 12 2,270$ <br />11 Preliminary Typical Cross Sections - 1 sht 2 6 8 2,050$ <br />12 Prel. Maint. of Traffic - 4 Phases max incl Detour(1" = 50') / 4 Shts 4 16 32 6,540$ <br />13 Prel Plan and Profile (1" = 20') / 3 Shts 2 8 20 3,750$ <br />14 Preliminary Pavement Markings and Signage (1"=40')/ 1 Sht 1 2 6 1,135$ <br />15 Ramp Layout / 1 Sht 1 1 6 1,005$ <br />16 Cross-Sections / 12 Shts 4 8 24 4,540$ <br />17 Preliminary Quantity Calcs and Cost Estimates 1 4 6 1,395$ <br />18 Utility Coordination 8 960$ <br />19 QA/QC time 8 4 2,000$ <br />20 Virtual Mtg with City / 30 % review 4 4 1,100$ <br />21 Compliance of City review at 30% 2 4 790$ <br />RW Engineering -$ <br />22 Title & Encumbrance Report (6)32 4,160$ <br />23 Legal Description (6)24 24 12 8,280$ <br />24 Plat Exhibit (6)24 48 12 11,400$ <br />25 R/W Staking (6)30 4,050$ <br />1 of 5
The URL can be used to link to this page
Your browser does not support the video tag.