My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Authorization Early Release Work - Splashpad, Kid Zone, Decking – Larson Danielson Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
Authorization Early Release Work - Splashpad, Kid Zone, Decking – Larson Danielson Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2024 2:05:19 PM
Creation date
8/13/2024 2:05:04 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/13/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of South Bend <br />FOUR WINDS FIELD EXPANSION & RENOVATION <br />EARLY RELEASE 2: EXHIBIT 2 <br />Early Release 2: Exhibit 2 Page 7/27 <br />8.Unsuitable soil removal and replacement is not included in the Early Release Work. This <br />price assumes that all natural soils found at subgrade elevations shown or derived from the <br />requirements of the Early Release Work documents provide the required bearing strength <br />for the new construction those soils will support. <br />9.Relocation of any existing utilities or other subsurface plumbing or electrical lines not <br />specifically noted on the Early Release Work documents is not included in the Early Release <br />Work. Where the plans note to verify the location of existing utilities, the existing location is <br />assumed to not conflict with the new work. <br />10.No additional building permit fees are included in the Early Release Work. Early Release <br />Authorization 1 included $15,000 for building permit fees as an allowance. That allowance <br />covered the current Contract Sum at the permit fee schedule for Remodels. The permit fee <br />allowance will be increased to the total project amount at the GMP. If the City of South Bend <br />requires payment for the entire project permit cost before the GMP, an additional Early <br />Release Authorization will be required for additional permit fees. <br />11.Builder’s Risk or equivalent Property Insurance is not included in the Early Release Work. <br />This changes Agreement Exhibit B – Insurance and Bonds. The Owner shall provide the <br />required property insurance noted in section B.2.3 of Agreement Exhibit B. <br />12.The outdoor showers and the water line serving those showers shown on sheet 2-C401 is <br />not included. No model was specified for these showers, preventing bidders from pricing <br />them accurately. Furthermore, the water shown on the civil sheet was not connected to an <br />active water service on the plumbing sheets. <br />13.Access to the construction area is through the parking lot of the adjacent property, the “Ivy.” <br />This access is assumed to be granted without additional restrictions or costs. No re-paving <br />of the parking lot or reconstruction of the sidewalk at the edge of the parking lot is included. <br />Gravel and steel plates will be placed over the existing sidewalk as shown on the logistics <br />plan included in section 00 31 13. <br />14.Neither additional nor reworked gas piping necessary to relocate the gas meter in Unit J is <br />included. NIPSCO is assumed to relocate the face of the meter on the existing gas riser. As <br />noted in clarification #5 above, NIPSCO charges are not included.
The URL can be used to link to this page
Your browser does not support the video tag.