Laserfiche WebLink
31 of each calendar year. A grace period shall be <br />allowed for the renewal of each license until January <br />11 of the next calendar year. <br />(2) Renewal. A person is eligible for a renewal license if <br />he has held a valid and unrevoked license under this <br />Article within the preceding twenty -four (24) months, <br />or has held a valid and unrevoked license under this <br />Article within the preceding forty -eight (48) months <br />and demonstrates to the satisfaction of the Board that <br />during at least twenty -four (24) months of that period <br />the person has been actively engaged in electrical work <br />applicable under the type of license held. If the <br />person fails to comply with either of the requirements <br />of this subsection, he must apply for and meet all <br />requirements for a new license. <br />(i) License fees. <br />(1) Class A: New: <br />Renewal: <br />(2) Class B: New: <br />Renewal: <br />Section 6 -24. Permits. <br />(a) Required in advance. <br />to be performed the installation or <br />wiring or equipment on or within any <br />within the City without obtaining in <br />Department. <br />$50.00 <br />$25.00 <br />$50.00 <br />$15.00 <br />No person shall perform or cause <br />alteration of any electrical <br />building, structure or premises <br />advance a permit from the <br />(b) Each application for a permit for installation or <br />alteration of electrical wiring or equipment shall be accompanied by <br />fees in accordance with the schedule below. <br />(1) Temporary service for construction: <br />60 AMP ............. ..........................$3.00 <br />100 AMP ............ ...........................4.00 <br />200 AMP ............ ...........................5.00 <br />(2) Service Entrance Equipment: <br />a. Domestic (Dwellings) : <br />60 AMP (efficiency apartments only) ....... 2.00 <br />100 AMP ........ ...........................3.00 <br />200 AMP ............... ..................4.00 <br />Over 200 AMP ... ...........................5.00 <br />b. Commercial or Industrial: <br />100 AMP ........ ...........................4.00 <br />200 AMP ........ ...........................6.00 <br />400 AMP .. ............................... .8.00 <br />600 AMP ........ ..........................10.00 <br />Over 600 AMP thru 2,000 AMP ..............12.00 <br />Over 2,000 AMP . ..........................15.00 <br />(3) Circuits: <br />a. Nonmetallic sheathed <br />cable, each ............ ................2.00 <br />b. Circuits in raceways, each ................3.00 <br />(4) Horsepower: <br />a. First hp...... ...........................5.00 <br />b. Each additional hp ........................0.20 <br />-14- <br />