My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 1 to OEA - Design Srvs. Edison WTP Proj No. 123-067 – United Consulting
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 1 to OEA - Design Srvs. Edison WTP Proj No. 123-067 – United Consulting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 3:13:30 PM
Creation date
7/23/2024 1:40:54 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
7/23/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
d. For the Additional Services or the modifications to services set forth above, Owner <br />shall pay Engineer the following additional or modified compensation: <br />1) Preliminary & <br />Final Design Phases (Lump Sum): $713,000 <br />2) Bidding Phase (Lump Sum): $26,200 <br />3) Construction Phase (Lump Sum): $240,500 <br />4) Post -Construction Phase <br />(Lump Sum): $21,800 <br />5) Laboratory Testing — Filter Media <br />Core Samples ($400/Sample up to 8): $3,200 <br />6) Total: $1,004,700 <br />e. The schedule for rendering services is modified as follows: <br />Item No. <br />Activity <br />Completion Schedule <br />1 <br />30% Preliminary Design Completion <br />120 Days from Notice to Proceed <br />2 <br />60% Preliminary Design Completion <br />90 Days from Receipt of Owner <br />30% Design Comments <br />3 <br />90% Preliminary Design Completion <br />60 Days from Receipt of Owner <br />60% Design Comments <br />4 <br />Final Design Completion <br />& Permit Acquisition <br />30 Days from Receipt of Owner <br />90% Design Comments <br />5 <br />Construction Bid Receipt <br />As Scheduled by Owner <br />6 <br />Construction Commencement <br />As Scheduled by Owner <br />7 <br />Construction Completion <br />As Scheduled by Owner <br />8 <br />Post -Construction Completion <br />As Scheduled by Owner <br />i Other portions of the Agreement (including previous amendments, if any) are modified <br />as follows: <br />1) N/A <br />2. Agreement Summary (Reference only) <br />a. Original Agreement amount: $96 300 <br />b. Net change for prior amendments: $N/A <br />c. This amendment amount: $1 004 700 <br />d. Adjusted Agreement amount: $1 101 000 <br />The foregoing Agreement Summary is for reference only and does not alter the terms of the Agreement, <br />including those set forth in Exhibit C. <br />Owner and Engineer hereby agree to modify the above -referenced Agreement as set forth in this <br />Amendment. All provisions of the Agreement not modified by this or previous Amendments remain in <br />effect. The Effective Date of this Amendment is <br />Page 2 <br />(Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.