Laserfiche WebLink
Page 1 (Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. This is EXHIBIT K, consisting of pages, referred to in and part of the Agreement between Owner and Engineer for Professional Services dated , . AMENDMENT TO OWNER-ENGINEER AGREEMENT Amendment No. __1__ 1. Background Data: a. Effective Date of Owner-Engineer Agreement: October 10, 2023 b. Owner: Board of Public Works, City of South Bend, Indiana c. Engineer: United Consulting d. Project: Edison WTP Improvements, 123-067 1. Description of Modifications: [NOTE TO USER: Include the following paragraphs that are appropriate and delete those not applicable to this amendment. Refer to paragraph numbers used in the Agreement or a previous amendment for clarity with respect to the modifications to be made. Use paragraph numbers in this document for ease of reference herein and in future correspondence or amendments.] a. Engineer shall perform or furnish the following Additional Services: 1) Visual surface inspection of the existing gravity filter underdrains in each filter cell with Owner once filter media is removed by others. 2) Coordination of filter media core samples (up to 8) to undergo a gradation analysis at a laboratory approved by the Owner. b. The Scope of Services currently authorized to be performed by Engineer in accordance with the Agreement and previous amendments, if any, is modified as follows: 1) The Basic Services (Part 1) previously struck in Exhibit A as part of the Agreement, Paragraphs A1.02 to A1.06 shall be unstruck and modified as shown in Attachment No. 1. c. The responsibilities of Owner are modified as follows: 1) Modify Paragraph B2.01.S. to include the following additional services: a) Provide and ship filter media core samples to laboratory (WestTech, Attention Lab, 600 Arrasmith Trail, Ames, IA 50010) for testing. Refer to Attachment No. 2 for additional information on the proposed analysis. b) Coordinate with Contractor in regard to preparation and submission of any local building permits applicable to the Project, as necessary.