City of South Bend <br />FOUR WINDS FIELD EXPANSION & RENOVATION <br />EARLY RELEASE 1: EXHIBIT 7 <br />Early Release 1: Exhibit 7 Page 38/38 <br />Construction Manager Contingency <br />The following Construction Manager contingency is included in the Early Release Work. This <br />contingency is for the Construction Manager’s exclusive use to cover those costs considered <br />reimbursable as the Cost of the Work but not included in a Change Order. The value of this <br />contingency shall not be increased, except in proportion to the amount of approved Change <br />Orders increasing the Early Release Work. <br />Amount Title <br />$111,965 CMc Post-Bid Contingency (1% of the total Early Release Work) <br />Design/Owner Contingency <br />The following Design/Owner contingency is included in the Early Release Work. This <br />contingency is for the Owner’s exclusive use to cover costs for work not included in the <br />specifications (Exhibit 3), drawings (Exhibit 4), and allowances listed above, subject to the <br />assumptions and clarifications in Exhibit 2. These costs include, but are not limited to, changes <br />to the scope of the project, design changes necessary to accomplish the originally intended <br />scope, unforeseen site and existing building conditions, and abnormal weather conditions. The <br />value of this contingency shall only be increased by the Owner’s direction. <br />Amount Title <br />$223,930 Design/Owner Contingency (2% of the total Early Release Work)