City of South Bend <br />FOUR WINDS FIELD EXPANSION & RENOVATION <br />EARLY RELEASE 1: EXHIBIT 7 <br />Early Release 1: Exhibit 7 Page 37/38 <br />List of Allowances and Contingencies <br />Allowances <br />The following allowances are included in the Early Release Work. These allowances serve two <br />purposes. First, these allowances provide funding sources for work in bid packages that are <br />being rebid. Second, these allowances fund potential work that may be needed to complete the <br />project, but which is either not defined in the project documents or not defined in sufficient <br />detail in the project documents to accurately estimate the value. The Early Release Work shall <br />be adjusted, either with additions or deductions, by Change Order, by the difference between <br />the actual cost of the work allocated to these allowances and the allowance value noted below. <br />Upon mutual agreement between the Construction Manager and Owner, these allowances may <br />be used for purposes other than the proposed uses noted below. <br />Amount Title Proposed Allowance Use <br />$100,000 MEP Demolition Demolish mechanical/HVAC, electrical, and plumbing <br />system necessary to erect the new Upper Deck <br />Structure. This includes removal of speakers, lights, other <br />electrical device hung from the existing roof structure that <br />is to be demolished as well as removal of exhaust fans <br />and ductwork on the concessions roofs that conflict with <br />the new Upper Deck Structure. <br />$15,000 Misc. Excavation Demolish the section of the field concrete retaining walls <br />and adjacent site concrete as needed to install the new <br />foul ball netting poles. Auger the holes for the new foul <br />ball netting poles. Backfill the area after the new concrete <br />is poured. Remove concrete, excavate, and backfill for <br />the new elevator pit in Unit C. <br />$15,000 Building Permit Obtain the general building permit. <br />$20,000 Pepsi Club <br />Remobilization <br />Remobilize the demolition and steel erection cranes and <br />crews, as well any other subcontractor’s crews in this <br />GMP to perform the Pepsi Club demolition, structure, and <br />shell in the 2025-26 offseason. The original bid schedule <br />in section 00 31 13 noted this work would occur in <br />sequence with the new Upper Deck structures in the <br />2024-25 offseason.