My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 1 to AIA A133 CMc Contract - Four Winds Field Phase I Proj No. 123-046 – Larson Danielson
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 1 to AIA A133 CMc Contract - Four Winds Field Phase I Proj No. 123-046 – Larson Danielson
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2024 1:40:54 PM
Creation date
7/23/2024 1:40:40 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
7/23/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of South Bend <br />FOUR WINDS FIELD EXPANSION & RENOVATION <br />EARLY RELEASE 1: EXHIBIT 2 <br />Early Release 1: Exhibit 2 Page 11/38 <br />12.Steel to be shop primed will be primed with the fabricator’s standard shop primers. These <br />shop primers are intended to only provide temporary and provisional protection against <br />corrosion. The intermediate and top coats specified in section 099113 will be applied directly <br />to the shop primer. Different primers or shop surface preparation methods, such as those <br />recommended by the paint manufacturer or those needed to achieve a different level of <br />paint system performance than that provided by a standard shop primer, are not included in <br />the Early Release Work. <br />13.New landscaping or restoration of existing landscaping is not included in the Early Release <br />Work. The grass and tree lawn spaces on the south and west sides of the existing stadium <br />will be stripped of existing grass and trees to complete this project. New topsoil, grass, trees, <br />mulch, and other landscaping are not included in the Early Release Work. <br />14.Unsuitable soil removal and replacement is not included in the Early Release Work. This <br />price assumes that all natural soils found at subgrade elevations shown or derived from the <br />requirements of the Early Release Work documents provide the required bearing strength <br />for the new construction those soils will support. <br />15.Relocation of any existing utilities or other subsurface plumbing or electrical lines not <br />specifically noted on the Early Release Work documents is not included in the Early Release <br />Work. Where the plans note to verify the location of existing utilities, the existing location is <br />assumed to not conflict with the new work. <br />16.Building permit fees are included in the Early Release Work as an allowance. This allowance <br />amount is more than sufficient to cover the general building permit based on the square <br />footage of the added building area at the City of South Bend’s published permit fee schedule <br />for New Construction and Additions. However, this allowance amount is not sufficient to <br />cover a building permit fee based on the estimated cost for the entire Upper Deck estimated <br />cost at the permit fee schedule for Remodels. <br />17.Builder’s Risk or equivalent Property Insurance is not included in the Early Release Work. <br />This changes Agreement Exhibit B – Insurance and Bonds. The Owner shall provide the <br />required property insurance noted in section B.2.3 of Agreement Exhibit B.
The URL can be used to link to this page
Your browser does not support the video tag.