Laserfiche WebLink
City of South Bend <br />FOUR WINDS FIELD EXPANSION & RENOVATION <br />EARLY RELEASE 1: EXHIBIT 2 <br />Early Release 1: Exhibit 2 Page 9/38 <br />Assumptions and Clarifications <br />The following assumptions and clarifications apply to the Scope of Work included in this Early <br />Release Work. <br />1.The Scope of Work included in the Early Release Work is that described in the specifications <br />(Exhibit 3), drawings (Exhibit 4), and allowances (Exhibit 7), subject to the assumptions and <br />clarifications noted below. <br />2.This Early Release Work only includes a partial release of the work described on the project <br />plans and documents. The intent of the Early Release Work is to allow the structure and shell <br />of the new Upper Decks to proceed while the remaining work needed to complete the scope <br />shown on the specifications (Exhibit 3) and drawings (Exhibit 4) is redesigned and rebidded. <br />3.The work described in the following Bid Packages in section 01 12 00 Subcontracts <br />Summary is included in the Early Release Work: <br />•BP1-Demolition <br />•BP2-Concrete <br />•BP5-Masonry <br />•BP6-Structural Steel <br />•BP8-General Trades <br />•BP9-Roofing <br />•BP10-Doors, Frames, & Hdw. <br />•BP11-Aluminum and Glazing <br />•BP12-Walls, Ceilings, & Paint <br />•BP13A-Carpet & Res. Flooring <br />•BP13B-Tiling <br />•BP14-Traffic Coatings <br />•BP15-Food Service Equipment <br />•BP16-Field Netting <br />•BP18-Elevators <br />•BP24-Furniture <br />•BP25-Field Exterior Signage <br />4.The work described in the following Bid Packages in section 01 12 00 Subcontracts <br />Summary is not included in the Early Release Work: <br />•BP3-Riser Systems <br />•BP4-Polished Concrete <br />•BP7-Casework <br />•BP17-Fixed Audience Seating <br />•BP19-Fire Sprinklers <br />•BP20-Plumbing <br />•BP21-Mechanical/HVAC