My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Drewry’s Brewery Phase II - Bottling House Demo Proj No. 119-031D - Renascent Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Bids
>
Opening of Bids - Drewry’s Brewery Phase II - Bottling House Demo Proj No. 119-031D - Renascent Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2024 1:26:45 PM
Creation date
7/23/2024 1:23:42 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/23/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Kansas City International Airport <br />Terminal A and Parking Garage, Kansas City, MO <br />Owner <br />Kansas City Aviation Department <br />General Contractor <br />Clark Construction (Bethesda, MD), Weitz, <br />Clarkson Construction (Joint Venture) <br />Size <br />1.1 million square feet <br />Delivery Method <br />Subcontractor <br />Contract Value <br />$4.9 million <br />Start Date <br />April 2019 <br />Completion Date <br />February 2020 <br />Total Hours Worked <br />6,010 <br />Recordable Incidents <br />0 <br />Industry Segment <br />Transportation, Airport <br />Project Scope Summary <br />Structural Demolition, Asbestos Abatement <br />The demolition of both the terminal and parking garage were completed using mechanical means. <br />The Terminal A Parking Garage was a two-story, post -tensioned concrete structure. To ovoid a <br />premature collapse of the structure, the challenge was to remove debris while maintaining tension <br />and then de -tension the cables at the end. Processing the concrete around the post -tensioned <br />cables, Renascent safely accomplished this step. All project concrete was crushed and remained on <br />site for placement by a future contractor for the construction of a new terminal. <br />Renascent: Experts in Demolition" <br />
The URL can be used to link to this page
Your browser does not support the video tag.