My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Drewry’s Brewery Phase II - Bottling House Demo Proj No. 119-031D - Adamo Demolition
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Bids
>
Opening of Bids - Drewry’s Brewery Phase II - Bottling House Demo Proj No. 119-031D - Adamo Demolition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 1:21:50 PM
Creation date
7/23/2024 1:18:13 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/23/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5. Pipeline 2000 hours <br />CCLs perform the following activities in association with the construction and <br />maintenance of gas, oil, and other material pipelines. Pipeline construction may consist <br />of, but not be limited to, the following activities: <br />a. Hoisting and rigging <br />b. Trenching and excavating <br />c. Site preparation/cleanup and security <br />d. Identify, inspect, use and maintain all tools specific to the concentration <br />i. hand <br />ii. electric <br />iii. gas <br />iv. pneumatic <br />e. Grade setting/checking <br />f. Layout and staking <br />g. Clearing and maintaining the right of way (ROW) <br />h. Pump water <br />i. Locate utilities <br />j. Build and dismantle fences <br />k. Load and unload pipe <br />1. Fill and place sandbags <br />m. Load, unload and place skids <br />n. Install erosion control systems <br />o. Pipe surface preparation/sand blasting <br />p. Apply pipe coating <br />q. Inspect pipe coating visually and with a holiday detector <br />r. Patch coating <br />s. Install pipe coating protection <br />t. Install corrosion protection <br />u. "Pig" the pipe <br />v. ROW remediation <br />6. Tunneling 2000 hours <br />CCLs perform the following activities in association with all work underground or in <br />compression chambers, including tending of the outer air lock. Tunnel construction <br />may consist of, but not be limited to, the following activities: <br />a. Drilling <br />b. Identify, inspect, use and maintain all tools specific to the concentration <br />i. hand <br />ii. electric <br />iii. gas <br />iv. pneumatic <br />c. Hoisting and rigging <br />d. Concrete pump operation and maintenance <br />e. Install services (track laying, conveyors, vents, water, compressed air <br />pipes etc.) <br />f. Install tunnel supports (steel ribs, mesh, rock bolts) <br />g. Shaft and tunnel grouting <br />h. Shotcrete/gunite application <br />i. Cutting and burning <br />7. Environmental Remediation <br />2000 hours <br />Construction Craft Laborer Appendix A Page 6 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.