Laserfiche WebLink
01.5 inch reveal drip edge color: white Cost : Included <br />02 rows of Ice Shield on eaves, COSt Included <br />valley, sidewalls, & Chimney <br />IT:Synthetic underlayment on Cost : Included <br />remaining roof decking <br />a Replace all roof boots, install ice (1 ' 3) ,(3"..4") Cost : Included <br />shield around pipes <br />Jr New step flashing and counter flashing color: Cost : <br />flashing on chimney <br />r Cover box vents, Install ridge box vents # Cost : <br />Included <br />NA <br />vent <br />Pull Roof Permit City: South Bend COSt . Included <br />r" Cost : <br />3) Additional <br />Remove additional roof layer ($30.00 per SQ.) <br />Unsound decking will be replaced at an additional charge. <br />4'x8' OSB 7/16" $50 <br />4'x8' OSB 1 /2" $60 Lumber 1 X6X10 $60 <br />Estimated Start Date: TBD upon signing of proposal <br />The actual start and completion dates may vary depending on weather, contractor availability, material availability, <br />concealed conditions, changes ordered by customer, vandalism, and other similar factors. Reasonable extensions of <br />time shall be allowed and Asscher Roofing LLC isn't liable for any claim or expenses due to delay. If the work is <br />contingent on approval by the customer's insurance company, the completion dates are expressed by the number of <br />days after sufficient notice from the insurance carrier approving adequate repair or restoration. <br />Asscher Roofing to provide dump trailer(not dumpster)and remove all construction debris same day upon completion. <br />Scope of Work: See work described in proposal. Asscher Roofing LLC shall perform the work in accordance with the <br />contract documents, manufacturer's specifications, and applicable law. Asscher Roofing LLC shall have sole control <br />over means, methods, techniques, sequences and procedures to complete the work. Asscher Roofing LLC shall <br />provide and pay for all labor, materials, supplies, tools, equipment, and machinery reasonably necessary to complete <br />the work. Some variation may occur in color, texture, and plans of materials. Asscher Roofing LLC may utilize <br />subcontractors, vendors, suppliers or others who aren't a party to this contract to provide labor, services, material, <br />equipment or machinery in connection with the work. <br />Contractors are fully insured. Start Date: Agreed upon acceptance of the proposal. Completion Date: 1 to 2 days on <br />average roof, weather permitting. Changes to Work. Changes to the scope of work or specifications may only be <br />made in a writing signed by the customer and Asscher Roofing LLC. The cost of the change will be added or <br />subtracted from the contract price as appropriate. <br />Asscher Roofing proposes hereby to furnish all labor, supplies, materials and equipment in accordance with the <br />above specifications for the sum of: <br />