My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
533 River Avenue_AA 2024-0719
sbend
>
Public
>
Historic Preservation
>
2024
>
August
>
Administrative Approvals
>
533 River Avenue_AA 2024-0719
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2024 2:22:16 PM
Creation date
7/19/2024 2:13:04 PM
Metadata
Fields
Template:
South Bend HPC
HPC Street Address
533 River Avenue
HPC Document Type
Certification
HPC Local Historic District
ii. Edgewater Drive
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
01.5 inch reveal drip edge color: white Cost : Included <br />02 rows of Ice Shield on eaves, COSt Included <br />valley, sidewalls, & Chimney <br />IT:Synthetic underlayment on Cost : Included <br />remaining roof decking <br />a Replace all roof boots, install ice (1 ' 3) ,(3"..4") Cost : Included <br />shield around pipes <br />Jr New step flashing and counter flashing color: Cost : <br />flashing on chimney <br />r Cover box vents, Install ridge box vents # Cost : <br />Included <br />NA <br />vent <br />Pull Roof Permit City: South Bend COSt . Included <br />r" Cost : <br />3) Additional <br />Remove additional roof layer ($30.00 per SQ.) <br />Unsound decking will be replaced at an additional charge. <br />4'x8' OSB 7/16" $50 <br />4'x8' OSB 1 /2" $60 Lumber 1 X6X10 $60 <br />Estimated Start Date: TBD upon signing of proposal <br />The actual start and completion dates may vary depending on weather, contractor availability, material availability, <br />concealed conditions, changes ordered by customer, vandalism, and other similar factors. Reasonable extensions of <br />time shall be allowed and Asscher Roofing LLC isn't liable for any claim or expenses due to delay. If the work is <br />contingent on approval by the customer's insurance company, the completion dates are expressed by the number of <br />days after sufficient notice from the insurance carrier approving adequate repair or restoration. <br />Asscher Roofing to provide dump trailer(not dumpster)and remove all construction debris same day upon completion. <br />Scope of Work: See work described in proposal. Asscher Roofing LLC shall perform the work in accordance with the <br />contract documents, manufacturer's specifications, and applicable law. Asscher Roofing LLC shall have sole control <br />over means, methods, techniques, sequences and procedures to complete the work. Asscher Roofing LLC shall <br />provide and pay for all labor, materials, supplies, tools, equipment, and machinery reasonably necessary to complete <br />the work. Some variation may occur in color, texture, and plans of materials. Asscher Roofing LLC may utilize <br />subcontractors, vendors, suppliers or others who aren't a party to this contract to provide labor, services, material, <br />equipment or machinery in connection with the work. <br />Contractors are fully insured. Start Date: Agreed upon acceptance of the proposal. Completion Date: 1 to 2 days on <br />average roof, weather permitting. Changes to Work. Changes to the scope of work or specifications may only be <br />made in a writing signed by the customer and Asscher Roofing LLC. The cost of the change will be added or <br />subtracted from the contract price as appropriate. <br />Asscher Roofing proposes hereby to furnish all labor, supplies, materials and equipment in accordance with the <br />above specifications for the sum of: <br />
The URL can be used to link to this page
Your browser does not support the video tag.