My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - 2024 Sewer and Manhole Rehabilitation Proj No. 122-019 - SAK Construction, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Bids
>
Opening of Bids - 2024 Sewer and Manhole Rehabilitation Proj No. 122-019 - SAK Construction, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 11:32:11 AM
Creation date
7/9/2024 2:47:57 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/9/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SAK CENTRAL REGION LETTER OF EXPERIENCE <br />www.sakcon.com <br />SAK Construction, LLC (SAK) is a full -service general contractor, construction management firm and <br />construction materials producer. SAK specializes in complex underground infrastructure projects <br />including wastewater, stormwater and combined sewer pipeline rehabilitation, and new tunnel <br />construction of large diameter conveyance pipelines and storage tunnels. <br />Company Headquarter! <br />Our approximately 115,000 square -foot headquarters, equipment fabrication, product manufacturing <br />and CIPP wet -out facility are located near St. Louis, Missouri, approximately 20 miles west on 1-70 <br />from Lambert St. Louis Airport. The address and contact information are: <br />SAK Construction, LLC <br />864 Hoff Road <br />O'Fallon, Missouri 63366 <br />Capabilities <br />(636) 385-1000 Telephone <br />(636)385-1100 Fax <br />bidcippc@sakcon.com <br />• Cured -in -place pipe lining (gravity) — 6" to 108" diameter <br />• Cured -in -place pipe lining (pressure) — 6" to 48" diameter <br />• Large Diameter Tunneling Utilizing TBM up to 24-foot & Hand Mining up to 32-foot arch <br />• Large Diameter Sliplining — 36" pipe and above <br />• Large Diameter Geopolymer <br />• SPR Spiral Wound PVC & PE <br />• Shotcrete <br />• Shaft Excavation <br />• Sewer Bypass, Sewer Cleaning & CCTV Inspection, & Structure Rehabilitation <br />• Cured -In -Place Pipe (CIPP) Tube Manufacturing <br />Management and Key Personnel/Experience <br />Tom Kalishman - Co Founder and Chairman <br />• Co -Founder and Chairman SAK Construction; 2006 to Present. <br />• Board of Directors, Insituform Technologies, Inc. (ITI) from 1997 to 2005. <br />• President of United Pipeline Systems (ITI subsidiary) in 1998. <br />• Director of East Regions, ITI 1997 to 1998. Business unit annual revenues exceeding $150mm. <br />• General Manager Southeast Region ITI from 1996 to 1997. <br />• Operations Manager Southeast Region ITI from 1994 to 1996. <br />• Operations Management Insituform Mid America from 1991 to 1993 <br />• MBA Northwestern University; Evanston, IL. <br />• B.S. in Economics, Wharton School at the University of Pennsylvania. <br />Jerry Shaw - Co Founder and President <br />• Co -Founder and President SAK Construction; 2006 to Present. <br />• Over 50 years' experience in the tunnel and pipeline rehabilitation industry. <br />• Vice President of Affholder, Inc. (ITI tunneling subsidiary) for 18 years from 1987 to 2005, <br />responsible for the overall operations of the company, which included estimating, field <br />operations, equipment acquisitions and cost projects. <br />• Day to day management of $25mm tunneling business which grew to $120mm annually. <br />• Project manager of various tunnel projects 1983 to 1987. <br />• B.S. in Business Administration, Southwest Missouri State University (now Missouri St. Univ.). <br />
The URL can be used to link to this page
Your browser does not support the video tag.