My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - 2024 Sewer and Manhole Rehabilitation Proj No. 122-019 - SAK Construction, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Bids
>
Opening of Bids - 2024 Sewer and Manhole Rehabilitation Proj No. 122-019 - SAK Construction, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 11:32:11 AM
Creation date
7/9/2024 2:47:57 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/9/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROPOSED <br />CIPP Installation Outline - Construction Plan <br />Step -by -Step Installation Process <br />Step 1 <br />Clean Line <br />➢ Run high pressure waterjetter through the line to remove any dirt, silt or other debris prior <br />to lining. Remove protruding laterals if necessary. <br />Step 2 <br />Pre - CCTV Line <br />➢ Run Closed Circuit Camera through the entire length of the line to ensure there are no <br />obstructions that could impede the installation of the liner. Assess pipe, locate cracks and <br />holes, protruding laterals, and all live service connections. <br />Step 3 <br />WetOut Tube <br />➢ Vacuum impregnation of the felt liner with thermo catalyst resin. <br />Step 4 <br />Transport Tube <br />➢ Tube transported via Refrigerated Truck to keep the tube malleable prior to installation. <br />Step 5 <br />Inversion of the Liner <br />➢ Inversion equipment set up over the manhole <br />➢ End of line is pulled from the truck and attached to the shooter. <br />➢ By use of Hydrostatic Pressure or Air Pressure, the liner is inverted in on itself (much like <br />pulling a sock inside -out) to conform to the interior of the existing line. <br />Step 6 <br />Curing of the Liner <br />➢ Once line is completely inverted into the existing line, the shooter is connected to the boiler <br />truck to initiate the cure process. <br />➢ Hot Water or Steam is cycled through the line setting off the resin to start the cure process. <br />➢ Internal atmosphere of the liner is maintained, per specification, at the required <br />temperature and time to fully cure the tube, end result is a jointless pipe running the full <br />length of the line from manhole to manhole. Finished product has similar characteristics of <br />your typical PVC pipe. <br />Step 7 <br />Cool down <br />➢ Once the liner has cured, water/air is cycled through for a specified cool downtime, to <br />ensure quality. <br />
The URL can be used to link to this page
Your browser does not support the video tag.