Laserfiche WebLink
Description: <br />LCRUD WWTP Region B Phase II, Contract A (682) — Owner: LaGrange County Regional <br />Utility District. Wastewater Treatment Plant Improvement. Installation of Sludge dewatering <br />Pad, Clarifier Equipment, UV Disinfection System, Aerobic Digesters, and all associated Piping. <br />Included new treatment plant buildings. $3,298,975.00. Completed: 2023. <br />Description: <br />Studebaker Fountain Water Improvement (722) - Owner: City of South Bend. Installation of <br />Water Service and Sanitary Lateral. Installation of new water softener and injection system for <br />pump house. All Restoration and Hard surface. $150,913.00. Completed: 2022. <br />Description: <br />Johnson St Sewer Extension (721) - Owner: City of Elkhart. Installation of 1400LF +/- of 12" <br />sanitary sewer and associated laterals. Including all grading, concrete flatwork, and complete <br />restoration. $1,393,846.00. Completed: 2022. <br />Description: <br />JA Drive Node Repair (719) — Owner: City of Elkhart. Installation of new Riprap diversion in <br />Elkhart River. $159,880.00. Completed: 2022. <br />Description: <br />Parking Lot & ADA Compliant Trail (717) — Owner: Indiana Dept. of Natural Resources. <br />Installation of approximately 1,400LF of gravel pathway. $159,850.00. Completed: 2022. <br />Description: <br />2021 Drainage Improvements - Kaley & Marion St (706) — Owner: City of South Bend. <br />Installation of new drainage structures, new concrete curb, and asphalt re -surfacing. <br />$246,810.00. Completed: 2022. <br />Description: <br />Laurel Woods Drainage Improvements (702) — Owner: City of South Bend. Excavation of <br />existing retention pond and site storm system. $125,142.00. Completed: 2022. <br />Description: <br />South Main Streetscapes Project (694) — Owner: City of Elkhart. Installation of 2700 LF of <br />24" perforated storm sewer and all appurtenances. Installation of 36" sanitary sewer. Complete <br />construction of new concrete sidewalks, driveways, and asphalt paving. $2,785,222.00. <br />Completed: 2022. <br />Description: <br />Buchanan - Yellow Lake Project (692) — Owner: Buchanan Land, LLC. Complete construction <br />of approximately 5 miles of gravel pathway through woods. $944,657.00. Completed: 2022. <br />