My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - 2024 Curb & Sidewalk Program Proj No. 124-009 - Selge Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Bids
>
Opening of Bids - 2024 Curb & Sidewalk Program Proj No. 124-009 - Selge Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 10:59:06 AM
Creation date
7/9/2024 2:46:57 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/9/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Description: <br />Citywide Water Service Replacement — Zone 10 (718) — Owner: City of Benton Harbor. <br />Complete replacement of approximately 400 new water services. Including 12000LF of <br />Trenchless installation. All Landscape and Restoration. $2,825,901.00. Completed: 2023. <br />Description: <br />Northshore/Eastshore Collection System (708) — Owner: Turkey Creek Regional Sewer <br />District. Installation of new gravity sewer system around lake. Installation of 10,000LF of 8" <br />Gravity sewer and associated structures. 280OLF of 4-8-inch Force main. Installation of new <br />pump stations and piping. All hard surface and restoration. $4,966,945.00. Completed: 2023. <br />Description: <br />CSO 18 Backwater Valve Replacement (707) — Owner: City of South Bend. Installation of <br />new back water check valve in existing structure. $124,980.00. Completed: 2023. <br />Description: <br />Lift Station 51, 52, 53 (699) — Owner: New Buffalo Township. Complete replacement and <br />installation of 3 new lift stations including wet well, valve vault, process and controls and all <br />restoration. $960,541.00. Completed: 2023. <br />Description: <br />Lift Station Improvements, Contract B (698) — Owner: St. Joseph County Board of Public <br />Works. Replacement of two lift stations complete. Including new wet wells, valve vaults and <br />controls. 24 EA ARV replacements at misc. locations. $1,294,195.00. Completed: 2023. <br />Description: <br />WWTP, Contract A (697) — Owner. Improvements to the Existing Wastewater Treatment Plant <br />including Sludge Transfer Pump Replacement, Clarifier Improvements and Upgrades. <br />$1,115,879.00. Completed: 2023. <br />Description: <br />SW Quadrant Roadway, Sewer & Watermain Extension (687) — Owner: Town of <br />Middlebury. New Sanitary Sewer System and Lift Station including: 6300 LF of 8" Gravity <br />Sewer, 78 EA Lateral Connections at the main. New Lift Station and Valve Vault and all <br />appurtenances. Installation of approximately 3000 LF 6"-12" Watermain. Installation of 4000 LF <br />of 12" -18" Storm Sewer and structures. 12,000 LF of Curb. All restoration and paving. <br />$4,106,203.00. Completed: 2023. <br />Description: <br />LCRUD Lift Station Regional B Phase II, Contract B (683) — Owner: LaGrange County <br />Regional Utility District. Complete Installation of 4 new lift stations. Including: Wet Wells, <br />Valve Vaults, Generators, process piping and Controls. All Restoration and Hard surface <br />included. $1,712,876.00. Completed: 2023. <br />
The URL can be used to link to this page
Your browser does not support the video tag.