2024 SB LSL Replacement - S.E. Zone Main and Service Replacement
<br />City Project No. 123-069B
<br />City of South Bend
<br />Bid Tabulation
<br />Base Bid - Division A - Lead Service Line Replacement - Indiana Ave. (Michiaan St. - Hiah St.) & Fox St. (Caroline St. - Ironwood Dr.l
<br />Engineer's Estimate
<br />Selge Construction
<br />HRP Construction
<br />Description
<br />Unit
<br />Duantity
<br />Unit Price
<br />Amount
<br />Unit Price
<br />Amount
<br />Unit Price
<br />Amount
<br />Mobilization/Demobilization
<br />1
<br />i.s
<br />$94,870.25
<br />$94,870.25
<br />$160,025.00
<br />$160,025.00
<br />$230,000.00
<br />$230,000.00
<br />FItem
<br />Maintenance of Traffic
<br />i
<br />LS
<br />$10,000.00
<br />$10,000.00
<br />$46,000.00
<br />$46,000.00
<br />$50,000.00
<br />$50,000.00
<br />Removals and Clearing
<br />1
<br />LS
<br />$30.000.00
<br />$30,000.00
<br />$235,000.00
<br />$235,000.00
<br />$750,000.00
<br />$750.000.00
<br />Concrete Curb, Remove
<br />3,530
<br />LFT
<br />$10.00
<br />$35,300.00
<br />$10.00
<br />$35,300.00
<br />$15.00
<br />$52,950.00
<br />5.
<br />Concrete Sidewalk, Remove
<br />2,040
<br />SYD
<br />$20.00
<br />$40.800.00
<br />$10.00
<br />$20,400.D0
<br />$23.00
<br />$46,920.00
<br />6.
<br />Existing Water Service, Potholing
<br />172
<br />EA
<br />$750.00
<br />$129,000.00
<br />$1,025.00
<br />$176.300.00
<br />$2,000.00
<br />$344,000.00
<br />T
<br />Temporary Erosion and Sediment Control
<br />1
<br />LS
<br />$5,000.00
<br />$5,000.00
<br />$7,500.00
<br />$7,500.00
<br />$15,000.00
<br />$15,000.00
<br />8.
<br />Compacted Aggregate, No. 53, 6"
<br />3,113
<br />SYD
<br />$14.50
<br />$45,138.50
<br />$30.25
<br />$94,16825
<br />$28.00
<br />$87,164.00
<br />9.
<br />HMA for Patching, 8"
<br />3,113
<br />SYD
<br />$40.00
<br />$124,520.00
<br />$89.00
<br />$277,067.00
<br />$140.00
<br />$435,820.00
<br />10.
<br />Standard Curb
<br />3,530
<br />LFT
<br />$45.00
<br />$158,850.00
<br />$60.50
<br />$213.565.00
<br />$47.00
<br />$165,910.00
<br />11.
<br />Concrete Sidewalk, 4"
<br />1,920
<br />SYD
<br />$70.00
<br />$134,400,00
<br />$70,50
<br />$135,360.00
<br />$68.00
<br />$130,560.00
<br />12.
<br />Concrete Curb Ramp
<br />125
<br />SYD
<br />$130.00
<br />$16,250.00
<br />$246.00
<br />$30,750.00
<br />$201.00
<br />$25,125.00
<br />13.
<br />Detectable Warning Surface
<br />30
<br />SYD
<br />$100.00
<br />$3,000.00
<br />$316.00
<br />$9,450.00
<br />$172.00
<br />$5,160.00
<br />14.
<br />Water Service, 1", Long Side
<br />91
<br />EA
<br />$7,500.00
<br />$682,500.00
<br />$9,186.00
<br />$835,835.00
<br />$8,800.00
<br />$800.800.00
<br />15,
<br />Water Service, 1", Short Side
<br />81
<br />EA
<br />$6,000.00
<br />$486,000,00
<br />$8,685.00
<br />$703,485.00
<br />$8,100.00
<br />$666,100.00
<br />16.
<br />Mulched Seeding, Type U
<br />3,325
<br />SYD
<br />$5.00
<br />$16,625.00
<br />$5.65
<br />$18,78625
<br />$10.00
<br />$33,250.00
<br />17.
<br />1 Street Tree
<br />12
<br />EA
<br />$750.00
<br />$9,000,00
<br />$895.00
<br />$10,740.00
<br />$639.00
<br />$7,668.00
<br />Total - Base Bid, Division A
<br />$2,021,253.75
<br />$3,009,721.50
<br />$3,836,427.00
<br />Base Bid - Division B - Water Main Replacement - Indiana Ave. (Michigan St. to Hiah St.)
<br />Engineer's Estimate
<br />Selge Construction
<br />HRP Construction
<br />Item
<br />No.
<br />Description
<br />Unit
<br />Quantity
<br />Unit Price
<br />Amount
<br />Unit Price
<br />Amount
<br />Unit Price
<br />Amount
<br />18.
<br />Concrete Curb, Remove
<br />213
<br />LFT
<br />$10.00
<br />$2,130.00
<br />$10.00
<br />$2,130.00
<br />$15.00
<br />$3,195.00
<br />19.
<br />Pavement, Remove
<br />545
<br />SYD
<br />$20.00
<br />$10,900.00
<br />$25,00
<br />$13,625.00
<br />$1 D0.00
<br />$54,500.00
<br />20.
<br />B-Borrow(Undistributed)
<br />100
<br />CYD
<br />$30.00
<br />$3,000.00
<br />$17.25
<br />$1,725.00
<br />$20.D0
<br />$2,000.00
<br />21.
<br />Water Main, Abandon in Place
<br />2,885
<br />LFT
<br />$30.00
<br />$86,550.00
<br />$19.25
<br />$55,536.25
<br />$20.00
<br />$57,700.00
<br />22.
<br />Compacted Aggregate, No. 53. 6"
<br />545
<br />SYD
<br />$14.50
<br />$7,902.50
<br />$30.25
<br />$16,486.25
<br />$28.00
<br />$15,260.00
<br />23.
<br />HMA for Patching, 8"
<br />415
<br />SYD
<br />$40.00
<br />$16,600.00
<br />$130.00
<br />$53,950,00
<br />$140.00
<br />$58,100.00
<br />24.
<br />PCCP for Approaches, 6"
<br />130
<br />SYD
<br />$100.00
<br />$13,000.00
<br />$166,00
<br />$21,580.00
<br />$132.00
<br />$17.160.00
<br />25.
<br />Standard Curb
<br />213
<br />LFT
<br />$45.00
<br />$9,585.00
<br />$28.50
<br />$6,070.50
<br />$47.00
<br />$10,011.00
<br />26.
<br />Water Main, 12"
<br />1,400
<br />LFT
<br />$125.00
<br />$175,000.00
<br />$157.50
<br />$220,500.00
<br />$155.00
<br />$217,OD0.00
<br />27.
<br />Water Main, 10"
<br />1,515
<br />LFT
<br />$85.00
<br />$128,775.00
<br />$135.50
<br />$206,282.50
<br />$110.00
<br />$166,650.00
<br />28.
<br />Gate Valve, 12"
<br />5
<br />EA
<br />$4,000.00
<br />$20,000.00
<br />$4,600.00
<br />$23,000.00
<br />$6,500.00
<br />$32,500.00
<br />29.
<br />Gate Valve, 10"
<br />5
<br />EA
<br />$3,250.00
<br />$16,260.00
<br />$3,700.00
<br />$18,500.00
<br />$5,5D0.00
<br />$27,600.00
<br />30.
<br />Tapping Sleeve and Valve, 12"x12"
<br />1
<br />EA
<br />$12,500.00
<br />$12,500.00
<br />$12,900.00
<br />$12,900.00
<br />$12,000.00
<br />$12,000.D0
<br />31.
<br />Tapping Sleeve and Valve, 6" x 6"
<br />4
<br />EA
<br />$8,000.00
<br />$32,000.00
<br />$5,450.00
<br />$21,800.00
<br />$8,000.00
<br />$32,000.00
<br />32.
<br />Tapping Sleeve and Valve, 10" x 10"
<br />1
<br />EA
<br />$9,000.00
<br />$9,000.00
<br />$8,400.00
<br />$8,400.00
<br />$9,500.00
<br />$9,500.00
<br />33.
<br />Item Omitted
<br />34.
<br />12" to 10" Reducer
<br />3
<br />EA
<br />$3,000.00
<br />$9.000.00
<br />$1,150.00
<br />$3,450.00
<br />$2,500.00
<br />$7,500.00
<br />35.
<br />Fire Hydrant, Assembly
<br />3
<br />EA
<br />$6,500.00
<br />$19,500.00
<br />$9,350.00
<br />$28,050.00
<br />$9.500.00
<br />1 $28,500.00
<br />36.
<br />Connect to Existing Fire Hydrant
<br />2
<br />EA
<br />$3,500.00
<br />$7,000.00
<br />$5,625.00
<br />$11,250.00
<br />$4,500.00
<br />$9,000.00
<br />37.
<br />Flowable Fill (Undistributed)
<br />100
<br />EA
<br />$80.00
<br />$8,000.00
<br />$130.00
<br />$13.000.00
<br />$125.00
<br />1 $12,500.00
<br />Total - Base Bid, Division B
<br />$580,692.50
<br />$737,235.50
<br />$772,576.00
<br />Base Bid Total (Division A+ B)
<br />$2,607,946.25
<br />$3,746,957.00
<br />$4,609,003.00
<br />1 of
<br />
|