My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - CSO 22 Control Valve Replacement Proj No. 123-032 - Selge
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Bids
>
Opening of Bids - CSO 22 Control Valve Replacement Proj No. 123-032 - Selge
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 1:00:17 PM
Creation date
6/11/2024 1:15:47 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/11/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Traffic <br />Bid proposal <br />Control <br />Speclalists.rw <br />Lettin Gate <br />1 Date Sent <br />6/10/2024 <br />6/7/2024 <br />Knox - Fun wa o � cra,w,ordsvme <br />Project Location <br />Attn: Estimating <br />City of South Bend SR 933 East of Florine <br />Ct. St Jose h Co <br />REP Quote Valid <br />Start Date Complellon Date I <br />Intermediate Completion Date <br />Closure/Restriction flays Calendar <br />AJD 30 Days <br />Line Item Number <br />Descri tian <br />801.06775 <br />Mainlainin Traffic <br />Ruanti Unit Price Ti <br />801.0$775 <br />Maintainin Traffic - Nan -Fixed Construction Sin <br />Daily Retrial As Needed <br />801-06775 <br />Maintainin Traffic - Barrel <br />$2.67 EA, per Calendar Da <br />801-06775 <br />Maintainin Traffic - Barrel wlLi hi <br />$t-04 EA, per Calendar Da <br />801-06775 <br />Maintainin Traffic - Sand Ba s <br />$1,37 EA, Per Calendar Da <br />801-06775 <br />Maintaining Traffic - DellveryCha a (Drop offOnl) <br />$0.09 EA r Calendar Da <br />801-06775 <br />Maintainin Traffic - Pick up Charge Pick up Only)515d,00 <br />$154.00 EA <br />FJ� <br />801-06775 <br />Maintaining Traffic - Dellvery and Setu <br />801-06775 IMaintainin <br />Traffio -Take Down and Removal <br />$9B-00 EA, Laborer r Hr. <br />801-05775 1 <br />Maintainin Q Traffic - Truck <br />$98-00 EA. Laborer per Hr- <br />801-06775 <br />Mainfaininn Trafr-rr. - Tune lit a� ,a <br />$31.68 EA, r Hr- <br />801-06775 <br />r oni r rwue wi i JI n <br />Maintainin Traffic - T pe III Barricade 2 Flash HDs and 1 Sin <br />54.69 EA, per Calendar Da <br />Maintaining Traffic - Arrowboard (Flashing Arrow Sign) <br />$5.37 EA, per Calendar Da <br />801-06775 <br />$24.53 Ea, Per Calendar Day <br />$154.00 Ea, Per Week <br />$317 00 Ea, Per Month <br />801-06775 <br />Maintaining Traffic - Flagging Operation (Up to 8 hrs) <br />(Includes: 2 Flag ers, Truck & Equipment) <br />$222-80 Per Hr Includes Travel <br />801-06775 <br />Maintaining Traffic - Flagging Operation (Over8 hrs & SAT) <br />(Includes 2 Flaggers, Truck & Equipment) <br />801-06775 <br />Maintaining Traffic - Flagging Operation {Holiday & SUNy <br />$277.98 Per Hr. Includes Travel <br />(Includes: 2 Flaggers. Truck & Equipment) <br />$327 04 Per Hr. Includes Travel <br />801-06775 <br />Each Additional Flagger - (Up to 6 hrs) <br />$99 13/HR <br />801-06775 <br />Each Additional Flagger - (Over 8 hrs & SAT) <br />$147 68/HR <br />801-06775 <br />Each Additional Flagger - (Holiday & SUN) <br />$198.27/HR <br />801-06775 <br />Single Lane Closure, Mon - Thu (< 24 hr. duration and 1 mile) <br />$2,42e-00 EA <br />801-06775 <br />Single Lane Closure, Fri - Sun (< 24 hr duration and 1 mile) <br />$2,759.00 EA <br />801-06775 <br />Shoulder Closure, Day, Mon - Thu (< 24 hr duration and 1 mile) <br />$1,374.00 EA <br />801-06775 <br />Shoulder Closure, Day, Fri. -Sun. (< 24 hr. duration and 1 mile) <br />$1571-00 EA <br />801-06775 <br />Additional days for lane closures beyond the first 24 hours <br />$103.00 EA <br />801-06775 <br />Additional miles for lane closures beyond the first mile <br />Note - If project goes into 2025 and beyond, daily rental rates will <br />S370,00 EA <br />increase. <br />TOTAL <br />1. Above quote is based on plans and specifications at the time of bid. Calendar days may be adjusted upon request, <br />2. Quote valid for 30 calendar days ONLY, contracts awarded after 30 days may require a requote. <br />3. Contact TCS, LLC if the proposal is NOT ACCEPTED IN WHOLE, <br />4. Items not paid by owner will be invoiced to the contractor at a daily rate, based on adjusted item unit price. <br />5. Changes by Engineer/Contractor require approved and signed change order, PRIOR to commencing work. <br />6. Retention will only be agreed to if Owner requires retention from Contractor. <br />7. All quantities are estimates only and actual installed quantities will be billed. <br />8. Proposal is subject to applicable state sales tax if a valid sales tax exemption certificate is not provided by the customer. <br />9, TICS, LLC must have at least 7-days notice prior to scheduled work, <br />10. Move -ins will be billed as quoted. All additional mobilizations will be billed. <br />11. Any Mobilization performed outside the hours of 7:00 am to 5:00 pm, Monday through Thursday, will incur additional costs. <br />Contacts: <br />For questions regarding the quote: <br />Estimating Manager: Rik Ritzler, Office 574-772.7001 Ext, 122 Cell: 574.806-7139 <br />iMalin 90high-starfraftcpm <br />To accept the quote, please contact Contract Administration: <br />Members of Laborers International Union of North America, ATSSA and BBB Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.