My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - CSO 22 Control Valve Replacement Proj No. 123-032 - Selge
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Bids
>
Opening of Bids - CSO 22 Control Valve Replacement Proj No. 123-032 - Selge
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 1:00:17 PM
Creation date
6/11/2024 1:15:47 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/11/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
***INDOT CERTIFIED WBE/DBE*** <br />F_1CSINIFLF- TILkti 5yil I 1 AL SHEET <br />FROM: <br />TO: <br />Jake DeHaven <br />Bidders DATE: <br />COMPANY: 06/10/24 <br />TOTAL NUMBER OF PAGES, INCLUDING COVER <br />FAX: 1 <br />RE: <br />COSB CSO 22 Cofferdam and Sheeting <br />Bidltem Bid Description Units Bid Quantity Bid Total U.P. fo!talArnount <br />1 MOB. AND DEMOB. LS 1.00 $15,000.0__-- _ _ ie1.005390,0000$ <br />TOTAL <br />Payment for sheet piling will be on a linear foot of wall driven basis. Quantity to be determined by Prime Contractor. <br />Our intent is to provide steel sheet piling in lengths not to exceed 50 feet. <br />Notes: <br />1. No Excavation, dewatering, or bracing is included unless noted. <br />2. Access to site for equipment and materials is Prime's responsibility. <br />3. Layout by others <br />4. Payment within 10 days after Prime is paid by owner. <br />5. No retainage held <br />6. No bond is included, If required, add 1 % to above pricing. <br />7. No items may be removed without permission from LCC. <br />8. Any crane matting or special access needs will be additional, or provided by others. <br />9. Clearance of any overhead obstacles is by others. <br />10. No vibration monitoring is included. If required, it is by others. <br />11. LCC is not responsible for damage to adjacent structures caused by vibration from sheeting installation. <br />12. All Sheeting is quoted as temporary, and price includes removal. <br />If you have any questions, feel free to call <br />Jake DeHaven <br />cell: 574-876-2769 <br />office: 219-393-5555 <br />
The URL can be used to link to this page
Your browser does not support the video tag.