My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Study & Devlmnt. DTSB Stormwater Plan Proj No. 124-034 – McCormick Engineering, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Study & Devlmnt. DTSB Stormwater Plan Proj No. 124-034 – McCormick Engineering, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2024 3:19:41 PM
Creation date
5/28/2024 3:19:25 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
5/28/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit A- Engineer’s Services <br /> <br />DTSB Stormwater Plan - Scope of Services <br /> <br />Page 16 of 17 <br /> (Exhibit A- Engineer’s Services) <br /> <br />Final Design Phase <br />MCCORMICK will perform the following tasks in order to complete the noted work: Prepare final <br />Drawings and Specifications and other documents outlined in Section A1.03 of the Contract. <br /> <br />Bidding and Negotiating Phase Contracts) <br />MCCORMICK will perform the following tasks io complete the noted work for both Prime Contracts: <br />Assist Owner in the solicitation and negotiation of Bids outlined in Section A1.04 of the Contract. <br /> <br />Construction Phase <br />MCCORMICK will perform the following tasks in order to complete the noted work: Unless otherwise <br />agreed by the Owner and Engineer, the Engineer services during the Construction phase shall be limited <br />to the work noted in Section A1.05.A of the Contract. <br /> <br />Post Construction Phase <br />MCCORMICK will perform the following tasks to complete the noted work: Unless otherwise agreed by <br />the Owner and Engineer, the Engineer services during the Construction phase shall be limited to the <br />work noted in Section A1.06 of the Contract. <br /> <br />Exclusions <br />This current Contract does not include fees or provisions for services beyond the Study and Report <br />Phase. Such services would require an amendment to the Contract if needed. Fees for services beyond <br />the Study and Report Phase are expected to be negotiated and agreed by both parties at a later date, <br />which could be incorporated into the Contract by amendment, including the associated fees and <br />budgets.
The URL can be used to link to this page
Your browser does not support the video tag.