My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 1 to PSA - Design Srvs. for SB Med Foundation Demo – American Structurepoint, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 1 to PSA - Design Srvs. for SB Med Foundation Demo – American Structurepoint, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2024 3:18:40 PM
Creation date
5/28/2024 3:18:32 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
5/28/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2023.03157/2024.00254 <br /> <br />9) Memo <br />a) Prepare brief memorandum summarizing all elements of utility planning outlined above, <br />including exhibits and supporting documents. <br />b) Present overview of plan to Owner. <br />c) Incorporate review comments into final memo. <br />d) Meetings: one design team coordination meeting and one review meeting with City. <br />e) Assumptions/exclusions: there will be a single iteration of revisions based on review <br />comments. <br />f) Deliverables: utility plan memo with compiled documents (format - pdf along with native <br />files) <br />10) Schedule <br />a) The scope of work will be completed within eight calendar weeks (excluding holidays) <br />after receiving the requested information. <br /> <br /> <br /> <br />DocuSign Envelope ID: E68A204F-EF94-4F07-9C0D-73FE7469F8D3
The URL can be used to link to this page
Your browser does not support the video tag.