Laserfiche WebLink
2023.03157/2024.00254 <br />Utility Planning Services <br />1) Data Collection. While this task will focus on the area containing planned facilities, it is <br />important to also view the nearby surrounding area to understand potential impacts on utility <br />networks. <br />a) Develop a utility coordination log (log), identifying all authorities having jurisdiction <br />(AHJs) in the project area which are anticipated to include providers of the following <br />utilities: water mains, sanitary sewer, combined sewer, storm sewer, gas mains, electric, <br />and telecommunications. <br />b) Request existing utility map information from each provider as it pertains to the project <br />area. <br />c) Conduct virtual utility coordination meetings with each utility provider to gather <br />information and discuss project scope and potential impacts. This may include, but is not <br />limited to: utility assets, functions, critical users, locations (horizontal and vertical if <br />known), sizing, materials, age, capacity (e.g., flow and pressure, voltage, etc.), <br />maintenance history, metered usage history by address, other buried structures, and <br />planned improvements. <br />d) Existing City of South Bend system information to be provider by owner shall include: <br />i) Asset Management data on water mains and sanitary sewer collection system <br />(including lift stations, if relevant). <br />ii) Data on the combined sewer system and the Long-Term Control Plan (LTCP), <br />including interceptors and combined sewer overflow outfall locations. <br />iii) Data on any separate storm sewers in the area. <br />iv) One year of utility usage data (from billing) for each parcel in the project area <br />(minimum, average day, maximum day, and peak hour). <br />e) Document all communications with each utility in the log. <br />f) Assumptions/exclusions: survey data will be provided by others. <br />g) Meetings: up to nine coordination meetings (telecommunications may have up to four <br />coordination meetings; all other utilities (water, sewer, storm, gas, electric) one <br />coordination meeting each) <br />h) Deliverables: utility coordination log, meeting notes <br />2) Utility Plan - Existing <br />a) Develop annotated GIS maps compiling all information gathered through the utility <br />coordination process on existing assets in the project area. <br />b) Add supplemental information from field-marked utilities that are located during the <br />survey and from publicly available aerial and street-level photography. <br />c) Assumptions/exclusions: existing utilities plan will not be developed until requested <br />information is received. <br />DocuSign Envelope ID: E68A204F-EF94-4F07-9C0D-73FE7469F8D3