My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - WWTP Solar Guaranteed Energy Savings Contract Proj. No. 124-015 - Ameresco
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Quotations/Proposals
>
Opening of Proposals - WWTP Solar Guaranteed Energy Savings Contract Proj. No. 124-015 - Ameresco
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2024 3:13:43 PM
Creation date
5/28/2024 3:12:07 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/28/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
283
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />“Page content is subject to Confidentiality Restrictions” <br /> <br />City of Arvada, Colorado | Project #37213 | M&V Report – Year 2 | Page 30 <br /> <br /> <br />City of Arvada, Colorado <br />ECM 16: Event Schedule Integration to BAS <br />Savings Unit Guaranteed Verified <br />kWh 10,392 10,392 <br />Therm 1,001 1,001 <br />Dollars $881 $881 <br /> <br />Overview of ECM <br />This measure included the integration of the event scheduling system with the BAS equipment schedules at Arvada <br />Center and City Hall in order to reduce the duration of occupied modes of equipment operation when the zones are <br />actually unoccupied. <br /> <br />Commissioning <br />After the installation of the ECM, commissioning activities were performed in accordance with Schedule Q of the EPC. <br /> <br />Prior to project acceptance, the installation of the ECM was verified through submittal review, graphics checks, trending <br />capability review, and confirmation of BAS integration. <br /> <br />During construction, the City of Arvada chose to not integrate the Google Calendar event schedules into the Delta <br />Facility Scheduler (DFS). Event scheduling will be done by the City of Arvada directly in DFS. <br /> <br />Measurement & Verification <br />The M&V Plan for this ECM was based on Agreed Upon Savings. The savings for this measure are achieved upon <br />project acceptance. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.