Laserfiche WebLink
<br /> <br /> <br />“Page content is subject to Confidentiality Restrictions” <br /> <br />City of Arvada, Colorado | Project #37213 | M&V Report – Year 2 | Page 30 <br /> <br /> <br />City of Arvada, Colorado <br />ECM 16: Event Schedule Integration to BAS <br />Savings Unit Guaranteed Verified <br />kWh 10,392 10,392 <br />Therm 1,001 1,001 <br />Dollars $881 $881 <br /> <br />Overview of ECM <br />This measure included the integration of the event scheduling system with the BAS equipment schedules at Arvada <br />Center and City Hall in order to reduce the duration of occupied modes of equipment operation when the zones are <br />actually unoccupied. <br /> <br />Commissioning <br />After the installation of the ECM, commissioning activities were performed in accordance with Schedule Q of the EPC. <br /> <br />Prior to project acceptance, the installation of the ECM was verified through submittal review, graphics checks, trending <br />capability review, and confirmation of BAS integration. <br /> <br />During construction, the City of Arvada chose to not integrate the Google Calendar event schedules into the Delta <br />Facility Scheduler (DFS). Event scheduling will be done by the City of Arvada directly in DFS. <br /> <br />Measurement & Verification <br />The M&V Plan for this ECM was based on Agreed Upon Savings. The savings for this measure are achieved upon <br />project acceptance. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />