<br /> <br /> <br />“Page content is subject to Confidentiality Restrictions” <br /> <br />City of Arvada, Colorado | Project #37213 | M&V Report – Year 2 | Page 27 <br /> <br /> <br />City of Arvada, Colorado <br />ECM 13: Plumbing Fixture Efficiency <br />Savings Unit Guaranteed Verified <br />Therm 2,099 2,183 <br />kGal 1,368 1,440 <br />Dollars $13,239 $13,922 <br /> <br />Overview of ECM <br />This measure included upgrading existing plumbing equipment to new, efficient equipment at Arvada Center, City Hall, <br />City Hall Annex, Indiana Shops, Lake Arbor Clubhouse, Streets Maintenance, West Woods Golf Clubhouse, West Woods <br />Golf Maintenance, and Wastewater Operations. Upgrades included toilet replacements, toilet flush valve retrofits, urinal <br />flush valve retrofits, sink aerator retrofits, and showerhead replacements. <br /> <br />Commissioning <br />After the installation of the ECM, commissioning activities were performed in accordance with Schedule Q of the EPC. <br /> <br />In order to verify proper installation during construction, Ameresco confirmed operation of all fixtures as they were <br />completed. Installation of the newly installed plumbing fixtures was inspected and found to be acceptable by <br />Ameresco. Baseline flow rate measurements were taken of a sample of the original fixtures prior to their removal from <br />service. <br /> <br />Operational performance of the new fixtures was tested. Initial performance tests of the wall-hung water closets were <br />found to be unacceptable. Therefore, these units were all replaced with toilets from another manufacturer. Once the <br />final scope was installed, the functional performance of all the fixtures was found to be acceptable by Ameresco. Flow <br />rate measurements were taken on a sample of the new fixtures. <br /> <br />Measurement & Verification <br />The M&V Plan for this ECM was based on IPMVP Option A – Retrofit Isolation Using a Key-Parameter Measurement. <br /> <br />Savings for this ECM were calculated using an Excel spreadsheet calculation to determine the baseline and proposed <br />water consumption and natural gas consumption for domestic hot water. Fixture flow rates, fixture utilization, and <br />heating plant efficiency are the key variables entered into the spreadsheet calculation that determine the savings. <br /> <br />For this ECM, the key parameter being measured is pre and post installation flow rates. The fixture utilization is set <br />forth in the water calculations, and it remains unchanged in calculating the verified savings. Pre and post installation <br />flow measurements were taken on a sample of the fixtures throughout the facilities. Flow measurements were grouped <br />and averaged by fixture type to determine the actual flow values that were used to update the savings calculation. <br />These measured flow rates were then inserted into the water savings spreadsheet calculation to determine the verified <br />savings. The plumbing fixture measurements are shown in Appendix I. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />