My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - WWTP Solar Guaranteed Energy Savings Contract Proj. No. 124-015 - Ameresco
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Quotations/Proposals
>
Opening of Proposals - WWTP Solar Guaranteed Energy Savings Contract Proj. No. 124-015 - Ameresco
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 2:51:56 PM
Creation date
5/28/2024 3:12:07 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/28/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
283
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AMERESCOd5 <br />Green . Clean . Sustainable <br />ECM 12: Solar PV <br />Verified <br />Guaranteed <br />VerifiedGuaranteed <br />RenewableLocation <br />.. <br />Solar <br />Solar <br />Energy Creditsle <br />..Production <br />City Hall <br />$5,944.45 <br />$1,334.29 <br />$1,346.22 <br />$604.35 <br />Arvada Center <br />$2,618.82 <br />$1,811.12 <br />$4,064.98 <br />$2,811.26 <br />Arvada Water <br />Treatment Plant <br />$ 2 555.72 <br />$3,308.64 <br />$3,604.98 <br />$4,667.02 <br />Indiana Shops <br />$1,331.01 <br />$1,379.53 <br />$1,930.99 <br />$2,001.35 <br />Lake Arbor <br />Police Station <br />$ 2 675.88 <br />$3,059.92 <br />$2,538.32 <br />$2,902.61 <br />West Woods <br />Police Station <br />$ 2 675.88 <br />$3,025.33 <br />$2,538.32 <br />$2,869.79 <br />Total Dollars <br />$17,801.79 <br />$13,918.85 <br />$16,023.8 <br />$15,856.39 <br />Overview of ECM <br />This measure included the installation of Solar PV (photovoltaic) systems at Arvada Center, Arvada Water Treatment <br />Plant, Indiana Shops, Lake Arbor Police Station, and West Woods Police Station. Two (2) inverters were also replaced at <br />an existing system that was installed on the roof of City Hall in 2010. <br />All sites other than the police stations, since they do not qualify for the solar PV tariff, will utilize the electric tariff <br />optimization described in ECM 10. <br />The new solar PV systems were installed as shown in the table below: <br />City Hall - Inverter Replacements <br />Existing <br />57.96 <br />Arvada Center <br />New <br />50.00 <br />Arvada Water Treatment Plant <br />New <br />50.40 <br />Indiana Shops <br />New <br />25.60 <br />Lake Arbor Police Station <br />New <br />52.80 <br />West Woods Police Station <br />New <br />52.80 <br />Commissioning <br />After the installation of the ECM, commissioning activities were performed in accordance with Schedule Q of the EPC. <br />City of Arvada, Colorado I Project #37213 1 M&V Report — Year 2 1 Page 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.