My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - WWTP Solar Guaranteed Energy Savings Contract Proj. No. 124-015 - Ameresco
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Quotations/Proposals
>
Opening of Proposals - WWTP Solar Guaranteed Energy Savings Contract Proj. No. 124-015 - Ameresco
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 2:51:56 PM
Creation date
5/28/2024 3:12:07 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/28/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
283
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AMERESCO4 <br />Green - Clean - Sustainable <br />ECM 5: RTU Upgrades <br />Savings Unit <br />kWh <br />Guaranteed <br />10,227 <br />Verified <br />10,277 <br />kW <br />41 <br />41 <br />Therm <br />1,133 <br />1,133 <br />Dollars <br />$1,810 <br />$1,810 <br />Overview of ECM <br />This measure included replacing a single zone constant volume roof top unit (RTU) that serves the backstage area of <br />the main theater at the Arvada Center. The existing unit was at the end of its useful life. The new unit is natural gas <br />fired with DX cooling, and it was installed with a transition curb, hail guards, and 100% outside air economizer. <br />Commissioning <br />After the installation of the ECM, commissioning activities were performed in accordance with Schedule Q of the EPC. <br />In order to verify proper installation during construction, Ameresco completed a submittal review, installation checkout, <br />operational verification, and a point-to-point check. <br />The commissioning process for this ECM included performance testing of the DX coil operation, heating coil operation, <br />outside air economizer operation, and safety and freeze stat operation. Also verified were schedules, setpoints, <br />sequences, lockouts, alarms, interlocks, and control strategies. A full pre functional test was completed on January 27tn, <br />2021 that verified all nameplate data, proper installation, and proper operation. <br />Installation of the new RTU was inspected and found to be acceptable by Ameresco. <br />Correct phase rotation of the supply fan was verified. Integration of the BACnet enabled RTU to the BAS was verified as <br />well. The unit was confirmed to have proper thermostat control, as well as properly functioning fan, furnace, and <br />compressors. <br />Measurement & Verification <br />The M&V Plan for this ECM was based on Agreed Upon Savings. The savings for this measure are achieved upon <br />project acceptance. <br />City of Arvada, Colorado I Project #37213 1 M&V Report — Year 2 1 Page 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.