My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - WWTP Solar Guaranteed Energy Savings Contract Proj. No. 124-015 - Ameresco
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Quotations/Proposals
>
Opening of Proposals - WWTP Solar Guaranteed Energy Savings Contract Proj. No. 124-015 - Ameresco
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2024 3:13:43 PM
Creation date
5/28/2024 3:12:07 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/28/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
283
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />“Page content is subject to Confidentiality Restrictions” <br /> <br />City of Arvada, Colorado | Project #37213 | M&V Report – Year 2 | Page 12 <br /> <br /> <br />City of Arvada, Colorado <br />ECM 2: Envelope: Added Insulation <br />Savings Unit Guaranteed Verified <br />kWh 1,077 1,077 <br />Therm 989 989 <br />Dollars $588 $588 <br /> <br />Overview of ECM and M&V <br />This measure added spray-foam insulation on the interior side of the exterior brick wall on the south mechanical <br />penthouse at City Hall. A total R-value of 14 was achieved by adding 2” of 2-part spray foam insulation to <br />approximately 900 square feet. <br /> <br />Commissioning <br />After the installation of the ECM, commissioning activities were performed in accordance with Schedule Q of the EPC. <br /> <br />The commissioning process for this ECM included an installation review of the insulation. A project closeout report was <br />provided by the installing contractor that documented final quantities and areas that received envelope improvements. <br />In addition to listing the final quantity and area of envelope improvements completed per building, post installation <br />pictures were provided, and pre and post installation infrared imaging was utilized to document the before and after <br />effects of the ECM. The infrared imaging for this ECM can be seen in Appendix B. <br /> <br />Installation of the insulation was inspected and found to be acceptable by Ameresco’s Construction Manager. <br /> <br />Measurement & Verification <br />The M&V Plan for this ECM was based on Agreed Upon Savings. The savings for this measure are achieved upon <br />project acceptance. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.