AMERESCO4 <br />Green - Clean - Sustainable <br />Project ECMs <br />ECM 1: Envelope: Infiltration Upgrades <br />Overview of ECM <br />This measure included sealing the building envelope to reduce infiltration loads. Gaps that were identified during the <br />envelope audits were sealed. This included new weather-stripping, sealant, and sweeps for doors; sealing of window <br />frames; and sealing of roof/wall penetrations. The facilities that received building envelope infiltration upgrades were <br />Arvada Center, Arvada Water Treatment Plant, City Hall, City Hall Annex, Indiana Shops, Lake Arbor Clubhouse, Ralston <br />Water Treatment Plant, Streets Maintenance, West Wood Golf Maintenance, and Wastewater Operations. <br />Commissioning <br />After the installation of the ECM, commissioning activities were performed in accordance with Schedule Q of the EPC. <br />The commissioning process for this ECM included an installation review of the new sealants, weather stripping, and <br />door sweeps. A project closeout report was provided by the installing contractor that documented final quantities and <br />areas that received envelope improvements. In addition to listing the final quantity and area of envelope improvements <br />completed per building, post installation pictures were provided, and pre and post installation infrared imaging was <br />utilized to document the before and after effects of the ECM at City Hall and City Hall Annex. The infrared imaging for <br />this ECM can be seen in Appendix A. <br />Installation of the new weather-stripping, as well as all associated insulation and sealing, was inspected and found to <br />be acceptable by Ameresco's Construction Manager. <br />Measurement & Verification <br />The M&V Plan for this ECM was based on Agreed Upon Savings. The savings for this measure are achieved upon <br />project acceptance. <br />City of Arvada, Colorado I Project #37213 1 M&V Report — Year 2 1 Page 11 <br />