My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - WWTP Solar Guaranteed Energy Savings Contract Proj. No. 124-015 - Ameresco
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Quotations/Proposals
>
Opening of Proposals - WWTP Solar Guaranteed Energy Savings Contract Proj. No. 124-015 - Ameresco
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 2:51:56 PM
Creation date
5/28/2024 3:12:07 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/28/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
283
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DocuSign Envelope ID: A95174CF-47BB-49A8-9A31-757C478FB907 <br />M&V Approach for ECM 10 - Electric Tariff Optimizations <br />Option S (agreed upon savings that have been <br />M&V Plan Description: <br />derived through engineering calculations) will be <br />used to quantify the energy cost savings <br />associated with this ECM. <br />• Key parameters for all baseline performance <br />parameters are set forth in calculations included in <br />Baseline Performance <br />the appendix. <br />Parameters: <br />• Key parameters are the actual billed electricity <br />usage (kWh's/yr) and electricity demand (kW) as <br />well as the old vs. new electric tariffs for the <br />affected accounts. <br />• All post -installation performance parameters are <br />Post Installation <br />set forth in calculations included in the appendix. <br />Performance Parameters: <br />• Key parameter is moving the Xcel electric accounts <br />to the new Xcel electric tariffs. <br />Performance Assurance <br />• Confirm accounts were transitioned to new tariffs. <br />Activities (Construction <br />•Include findings in Post Installation Report <br />Period): <br />generated after completion of installation of <br />project. <br />• No ongoing measurements involved with this <br />ECM. <br />Performance Assurance <br />• Quarterly site visits to all Customer facilities <br />Activities (Year 1): <br />impacted by EPC project. <br />• Calculate energy cost savings achieved during the <br />first Guarantee Year <br />• Include findings in annual M&V Report. <br />• No ongoing measurements involved with this <br />Performance Assurance <br />ECM. <br />Activities (Year 2-3): <br />• Calculate energy cost savings achieved during <br />Guarantee Years 2, 3. <br />• Include findings in annual M&V Report. <br />EPC Schedule D, Rev 7-2017 Page 12 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.