Laserfiche WebLink
EPC Schedule D, Rev 7-2017 Page 11 of 17 <br />M&V Approach for ECM 9 – Street Lighting Upgrades <br />M&V Plan Description: <br />Option A (key parameter measurement) will be <br />used to quantify the energy savings associated <br />with this ECM. <br />Baseline Performance <br />Parameters: <br />x Key parameters include exiting fixture quantities <br />wattages hours of operation (burn hours). <br />x All baseline performance parameters are set forth <br />in calculations included in the appendix. <br />Post Installation <br />Performance Parameters: <br />x All post-installation performance parameters are <br />set forth in calculations included in the appendix. <br />x New retrofit wattages, hours of operation. <br />Performance Assurance <br />Activities (Construction <br />Period): <br />x Confirm ECM was installed as stated in the scope <br />of work and is performing as specified prior to <br />acceptance. <br />x Sample (80/20 statistical criteria)) of pre and post <br />wattage readings on affected lighting systems. <br />x Confirm as-built quantities. <br />x Include findings in Post Installation Report <br />generated after completion of installation of <br />project. <br />x Calculate energy savings achieved with final as- <br />built counts, pre-post kW readings. <br /> <br />Performance Assurance <br />Activities (Year 1): <br />x No ongoing measurements involved with this <br />ECM. <br />x Quarterly site visits to all Customer facilities <br />impacted by EPC project. <br />x Include construction period findings in annual <br />M&V Report. <br />Performance Assurance <br />Activities (Year 2-3): <br />x No ongoing measurements involved with this <br />ECM. <br />x Include construction period findings in annual <br />M&V Report. <br /> <br /> <br />DocuSign Envelope ID: A95174CF-47BB-49A8-9A31-757C478FB907