My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - WWTP Solar Guaranteed Energy Savings Contract Proj. No. 124-015 - Ameresco
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Quotations/Proposals
>
Opening of Proposals - WWTP Solar Guaranteed Energy Savings Contract Proj. No. 124-015 - Ameresco
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2024 3:13:43 PM
Creation date
5/28/2024 3:12:07 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/28/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
283
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EPC Schedule D, Rev 7-2017 Page 11 of 17 <br />M&V Approach for ECM 9 – Street Lighting Upgrades <br />M&V Plan Description: <br />Option A (key parameter measurement) will be <br />used to quantify the energy savings associated <br />with this ECM. <br />Baseline Performance <br />Parameters: <br />x Key parameters include exiting fixture quantities <br />wattages hours of operation (burn hours). <br />x All baseline performance parameters are set forth <br />in calculations included in the appendix. <br />Post Installation <br />Performance Parameters: <br />x All post-installation performance parameters are <br />set forth in calculations included in the appendix. <br />x New retrofit wattages, hours of operation. <br />Performance Assurance <br />Activities (Construction <br />Period): <br />x Confirm ECM was installed as stated in the scope <br />of work and is performing as specified prior to <br />acceptance. <br />x Sample (80/20 statistical criteria)) of pre and post <br />wattage readings on affected lighting systems. <br />x Confirm as-built quantities. <br />x Include findings in Post Installation Report <br />generated after completion of installation of <br />project. <br />x Calculate energy savings achieved with final as- <br />built counts, pre-post kW readings. <br /> <br />Performance Assurance <br />Activities (Year 1): <br />x No ongoing measurements involved with this <br />ECM. <br />x Quarterly site visits to all Customer facilities <br />impacted by EPC project. <br />x Include construction period findings in annual <br />M&V Report. <br />Performance Assurance <br />Activities (Year 2-3): <br />x No ongoing measurements involved with this <br />ECM. <br />x Include construction period findings in annual <br />M&V Report. <br /> <br /> <br />DocuSign Envelope ID: A95174CF-47BB-49A8-9A31-757C478FB907
The URL can be used to link to this page
Your browser does not support the video tag.