Laserfiche WebLink
DocuSign Envelope ID: A95174CF-47BB-49A8-9A31-757C478FB907 <br />M&V Approach for ECM 9 - Street Lighting Upgrades <br />Option A (key parameter measurement) will be <br />M&V Plan Description: <br />used to quantify the energy savings associated <br />with this ECM. <br />• Key parameters include exiting fixture quantities <br />Baseline Performance <br />wattages hours of operation (burn hours). <br />Parameters: <br />• All baseline performance parameters are set forth <br />in calculations included in the appendix. <br />• All post -installation performance parameters are <br />Post Installation <br />set forth in calculations included in the appendix. <br />Performance Parameters: <br />• New retrofit wattages, hours of operation. <br />• Confirm ECM was installed as stated in the scope <br />of work and is performing as specified prior to <br />acceptance. <br />• Sample (80/20 statistical criteria)) of pre and post <br />Performance Assurance <br />wattage readings on affected lighting systems. <br />Activities (Construction <br />• Confirm as -built quantities. <br />Period): <br />• Include findings in Post Installation Report <br />generated after completion of installation of <br />project. <br />• Calculate energy savings achieved with final as - <br />built counts, pre -post kW readings. <br />• No ongoing measurements involved with this <br />ECM. <br />Performance Assurance <br />• Quarterly site visits to all Customer facilities <br />Activities (Year 1): <br />impacted by EPC project. <br />• Include construction period findings in annual <br />M&V Report. <br />• No ongoing measurements involved with this <br />Performance Assurance <br />ECM. <br />Activities (Year 2-3): <br />• Include construction period findings in annual <br />M&V Report. <br />EPC Schedule D, Rev 7-2017 Page 11 of 17 <br />