Laserfiche WebLink
<br /> <br />Energy Solutions <br />For Every Need <br />City of South Bend, IN <br />RFP Guaranteed Energy Savings <br />Contract Department of Public Works <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Audited | Designed | Implemented <br /> <br />ii. Name, Address, Phone Number <br />of the Owner Representative <br />Bridget Slavin <br />1301 Maple Street <br />Bristol, IN 46507 <br />P: (402) 359-2201 <br />E: bridget.slavin@valmont.com <br />iii. Firm Responsibility <br />Audit | Design | Implemented <br /> <br />iv. Type of Contract <br />Design-Build <br /> <br />v. Total contract dollar amount <br />and term in years <br />$2,530,094 <br />Design-Build project, term not applicable. <br /> <br />vi. Scope of Work / Energy Measures <br />Equipment Used <br />Ameresco designed, implemented, procured <br />and managed the installation of a ground <br />mounted 718 kW DC single axis tracking <br />solar system at the Bristol plant facility. <br />Ameresco managed the installation of <br />fencing around the solar field, install all <br />supports/foundations for racking systems, <br />furnish, install, and commission data <br />acquisition system. <br /> <br /> <br />(vi. Scope Continued) <br />Monocrystalline, monofacial, PV modules, ground- <br />mounted on a single axis tracking system. Customer <br />provided racking system for modules. <br /> <br />vii. Sources of project funding <br />Self-Funded. ITC: 30% on the sell price Leveraged a <br />net-metering agreement with the local utility to get <br />project down to a 9 year ROI and 9.7% IRR <br /> <br />viii. Projected & actual project start & end <br />dates; current status <br />Project Contract: June 23, 2022 <br />Project End: December 1, 2023 <br />Status: Complete <br /> <br />ix. Projected Annual Utility Savings <br />The project was designed to provide 100% of the <br />energy for the plant. <br /> <br />x. Actual & measured annual utility savings <br />As a Design-Build project, the customer did not <br />select M & V. the system was designed to offset <br />nearly 18,040 metric tons of CO2 over its 25-year <br />useful life and will provide a net return of nearly <br />$4M over that period. 65,280 credits in net <br />metering. The Data Acquisition System tracks <br />production. <br /> Valmont Industries <br /> Bristol, Indiana <br />Audited | Designed | Implemented <br />