My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - WWTP Solar Guaranteed Energy Savings Contract Proj. No. 124-015 - Ameresco
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Quotations/Proposals
>
Opening of Proposals - WWTP Solar Guaranteed Energy Savings Contract Proj. No. 124-015 - Ameresco
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 2:51:56 PM
Creation date
5/28/2024 3:12:07 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/28/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
283
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AMERESCO Energy Solutions <br />For Every Need <br />ii. Name, Address, Phone Number <br />of the Owner Representative <br />Michele Crane, Facilities Design & <br />Construction Manager <br />1101 Arapahoe Ave, Boulder, CO <br />(303) 441-4275 <br />CraneM@bouIdercolorado.gov <br />iii. Firm Responsibility <br />Ameresco designed, developed, <br />implemented, and conducted Measurement <br />& Verification <br />iv. Type of Contract <br />Energy Performance Contract <br />v. Total contract dollar amount <br />and term in years <br />$2,662,859 <br />Term fifteen (15) years <br />vi. Scope of Work / Energy Measures <br />Equipment Used <br />Ameresco was commissioned to construct <br />a 1.6 MWdc ground mounted solar PV <br />system at the City of Boulder's 63rd Street <br />Wastewater Treatment Plant. This project <br />presented numerous challenges such as <br />(vi. continued) <br />relocating established wildlife on the property, <br />futureproofing the solar development to account for <br />upcoming expansions of the plant itself., and <br />working within a short construction timeline — the <br />project was completed in less than two months. <br />vii. Sources of project funding <br />Lease <br />viii. Projected and actual project start and <br />end dates; current status <br />Started: February 9, 2018 contract signed <br />Completed: August 21, 2018 <br />Status: completed <br />ix. Projected Annual Utility Savings <br />x. Actual and measured annual util <br />City of South Bend, IN <br />RFP Guaranteed Energy Savings <br />Contract Department of Public Works <br />
The URL can be used to link to this page
Your browser does not support the video tag.