Laserfiche WebLink
AMERESCOd5 <br />Green - Clean . Sustainable <br />Arvada Center <br />Arvada Center - Year 2 Solar PV Production <br />9,000 <br />8,000 <br />7,000 <br />6,000 <br />5,000 <br />4,000 <br />3,000 <br />2,000 <br />1,000 <br />Apr <br />May Jun Jul Aug Sep Oct Nov <br />❑ec <br />Jan Feb Mar <br />■Guaranteed 6,484 <br />7,861 8,298 8,368 7,292 6,727 5,038 3,549 <br />2,695 <br />3,279 3,924 6,319 <br />0 Actual 0 <br />0 84 7,874 7,822 6,552 5,877 3,306 <br />2,827 <br />1,050 3,904 6,588 <br />■Guaranteed ■Actual <br />Arvada Center - Year 2 Total Solar PV Production Summary <br />Guaranteed <br />Actual <br />Percent of Guarantee Produced <br />69,835 kWh <br />45,882 kWh <br />66% <br />The actual solar production at Arvada Center was very close to the guaranteed amount for 8 out of the 12 months <br />during the performance period. <br />An almost complete lack of actual production can be observed in April, May and June 2022. In mid -March of 2022, <br />Arvada Center suffered a phase loss from the electrical service during a late -winter storm. This event caused equipment <br />failures throughout the building, including a critical component of the solar PV system known as the rapid shutdown <br />device, which is required for operation. Diagnosing this failure took time, and then the new parts had to be ordered. <br />Repairs were made in late June, and production resumed. This caused 3 months of essentially no production during the <br />performance period. <br />The fourth month with production that was significantly less than guaranteed was January, which is very likely the <br />result of snow cover on the panels. <br />For this Year 2 report, we are showing the actual production without any adjustment for the utility level event that <br />took the system offline or the reduced production in January. It should be noted that both of these events are <br />outside of the control of Ameresco. Should future events cause a more dramatic loss of production, an adjustment <br />may be necessary. <br />City of Arvada, Colorado I Project #37213 1 M&V Report - Year 2 1 Page 65 <br />