My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - WWTP Solar Guaranteed Energy Savings Contract Proj. No. 124-015 - Ameresco
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Quotations/Proposals
>
Opening of Proposals - WWTP Solar Guaranteed Energy Savings Contract Proj. No. 124-015 - Ameresco
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 2:51:56 PM
Creation date
5/28/2024 3:12:07 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/28/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
283
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AMERESCO4 <br />Green - Clean - Sustainable <br />Appendix I — Year 2 Solar PV Production <br />City Hall <br />City Hall <br />- Year 2 Solar PV Production <br />14,000 <br />12,000 <br />10,000 <br />8,000 <br />6,000 <br />4,000 <br />2,000 <br />0 <br />Apr May <br />Jun Jul <br />Aug Sep Oct Nov Dec Jan Feb Mar <br />■Guararite ed 11,098 12,047 <br />12,219 13,092 <br />12,041 11,678 8,787 6,097 4,950 5,751 6,820 10,971 <br />■Actual 6,491 3,696 <br />3,263 4,415 <br />541 0 0 2,531 5,909 8,211 7,264 6,961 <br />■Guaranteed ■Actual <br />City Hall - Year 2 Total Solar PV Production Summary <br />Guaranteed <br />Actual <br />Percent of Guarantee Produced <br />115,551 kWh <br />49,280 kWh <br />43% <br />The Scope of Work for the Solar PV ECM at City Hall was just inverter replacements for the existing solar PV system. <br />During field investigation activities for project development, it was noted that one of the two existing inverters was <br />damaged and non -operational. Since the units were at the end of their useful life, both were replaced. <br />As Ameresco began tracking the system performance at City Hall, it was observed that the actual production was falling <br />well short of the expected production. Upon investigation, it was discovered that an existing condition was causing <br />faults on the strings. This can clearly be seen continuing in the Year 2 period in the chart above, with significant losses <br />of production throughout the year. <br />Although the data tracking process has revealed existing conditions that are outside of Ameresco's scope and <br />control, we are only claiming the actual production for the Year 2 verified savings. <br />City of Arvada, Colorado I Project #37213 1 M&V Report — Year 2 1 Page 64 <br />
The URL can be used to link to this page
Your browser does not support the video tag.