Laserfiche WebLink
<br /> <br />May 24, 2024 <br /> <br />Re: Demolition Plan- South Bend Medical Building <br /> South Bend, IN <br /> <br />Subject: Alpine Demolition Services, LLC (Alpine) demolition plan of the existing buildings at the above location. <br /> <br />1. Existing Conditions: <br />• 7 story building with multiple additions and a basement. <br />• Standalone chiller Enclosure <br /> <br />2. Safety and Site Security: <br />• All personnel on site have been trained by Alpine Demolition on safety and OSHA rules regarding demolition. <br />• Proper PPE to be worn by all personnel on site. <br />o Hard hats, safety glasses, highly visible safety vests, steel toe work shoes. <br />o Dust masks or half face respirators in dusty conditions. <br /> <br />3. Mobilization/Construction Access: <br />• Equipment will be delivered via semi low boys and stored on site within the work area for the duration of the <br />specific demolition activities. <br />• All deliveries will access the jobsite via the assigned gate. <br />• Access to the work zone to be limited to Construction personnel only. <br /> <br />4. Traffic Control <br />o Excavator and skid steer will be kept on site within project limits. Dump truck loading will be handled within project <br />limits. Flagman will be present when trucks are entering and leaving the job site. <br /> <br />5. Emergency Response: <br />• Emergency services on this project can be accessed by 911 <br />• Clinic: TBD <br />• All personnel to sign in at beginning of shift. <br /> <br />6. Alpine Demolition Project Team: <br />• Karsten Pawlik – Vice President of Operations <br />630.918.3906 <br />Karsten@knockitdown.com <br /> <br />• John Moore – General Superintendent <br />630.973.0600 <br />john@knockitdown.com <br /> <br />• Zach Krueger – Project Engineer <br />630-675-7783 <br />zach@knockitdown.com <br /> <br />• Eduardo Torres – Safety Director <br />630-297-0777 <br />eduardo@knockitdown.com <br />