Laserfiche WebLink
May 28, 2024 | Page 3South Bend Medical Foundation Demolition | City of South Bend <br />2. CURRENT PUBLIC WORKS PROJECTS <br />Reconstruction of I-496 roadway, drainage and bridge rehab from Lansing Road to <br />the bridges over the Grand River. Bridge rehabilitation of 12 bridges along the corridor <br />including bridge deck removal and replacement on three bridges and structural steel <br />substructure repairs of all 17 bridges. Mainline roadway removal and replacement <br />including asphalt pavement, barrier wall, trunk line drainage, signage, noise wall, lighting <br />and guardrail. <br />Total Project Cost $81,000,000 <br />Size N/A <br />Timeline October 2021 - October 2024 <br />I-496 MDOT - LANSING, MI <br />26-mile design-build double-tracked commuter rail line between DFW International <br />Airport (DFW) and Shiloh Road in Plano, Texas with 10 stations and traverses seven <br />cities, interfaces with three DART light rail lines (Red, Orange, and Green Lines) and <br />connects with both the Trinity Metro TEXRail commuter rail line and the airport Sky <br />Link People Mover at DFW. <br />Total Project Cost $1,400,000,000 <br />Size 26 miles <br />Timeline January 2019 - December 2025 <br />DART SILVER LINE - CARROLLTON, TX <br />The Northeast Flow Control Facility (NE FCF), a flow control facility rated for 200 million <br />gallons per day (mgd), and large diameter (42-inch to 96-inch) welded steel pipe (WSP) <br />water transmission mains were constructed to provide finished water to the Northeast <br />Water Treatment Plant (NE WTP) to supplement flows treated at the NE WTP. Challenges <br />included working around existing utilities and process piping including live tapping into <br />the plant’s current treatment systems and piping. <br />Total Project Cost $25,000,000 <br />Size N/A <br />Timeline September 2019 - December 2024 <br />NORTHEAST FLOW CONTROL FACILITY - DETROIT, MI