My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Demolition of South Bend Medical Foundation Proj No. 123-076 - Walsh Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Bids
>
Opening of Bids - Demolition of South Bend Medical Foundation Proj No. 123-076 - Walsh Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2024 3:06:38 PM
Creation date
5/28/2024 3:06:20 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/28/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
May 28, 2024 | Page 3South Bend Medical Foundation Demolition | City of South Bend <br />2. CURRENT PUBLIC WORKS PROJECTS <br />Reconstruction of I-496 roadway, drainage and bridge rehab from Lansing Road to <br />the bridges over the Grand River. Bridge rehabilitation of 12 bridges along the corridor <br />including bridge deck removal and replacement on three bridges and structural steel <br />substructure repairs of all 17 bridges. Mainline roadway removal and replacement <br />including asphalt pavement, barrier wall, trunk line drainage, signage, noise wall, lighting <br />and guardrail. <br />Total Project Cost $81,000,000 <br />Size N/A <br />Timeline October 2021 - October 2024 <br />I-496 MDOT - LANSING, MI <br />26-mile design-build double-tracked commuter rail line between DFW International <br />Airport (DFW) and Shiloh Road in Plano, Texas with 10 stations and traverses seven <br />cities, interfaces with three DART light rail lines (Red, Orange, and Green Lines) and <br />connects with both the Trinity Metro TEXRail commuter rail line and the airport Sky <br />Link People Mover at DFW. <br />Total Project Cost $1,400,000,000 <br />Size 26 miles <br />Timeline January 2019 - December 2025 <br />DART SILVER LINE - CARROLLTON, TX <br />The Northeast Flow Control Facility (NE FCF), a flow control facility rated for 200 million <br />gallons per day (mgd), and large diameter (42-inch to 96-inch) welded steel pipe (WSP) <br />water transmission mains were constructed to provide finished water to the Northeast <br />Water Treatment Plant (NE WTP) to supplement flows treated at the NE WTP. Challenges <br />included working around existing utilities and process piping including live tapping into <br />the plant’s current treatment systems and piping. <br />Total Project Cost $25,000,000 <br />Size N/A <br />Timeline September 2019 - December 2024 <br />NORTHEAST FLOW CONTROL FACILITY - DETROIT, MI
The URL can be used to link to this page
Your browser does not support the video tag.