My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10.26.2021-SBN-Standards-Manufacturer-Additions-Minor-Revisions-final
sbend
>
Public
>
Public Works
>
City of South Bend Construction Standards & Specifications
>
10.26.2021-SBN-Standards-Manufacturer-Additions-Minor-Revisions-final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2024 3:44:43 PM
Creation date
5/6/2024 3:43:30 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
City Property
Document Date
5/6/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION 7 – EARTHWORK & EROSION AND SEDIMENT CONTROL <br />91 <br />SECTION 7 – EARTHWORK & EROSION AND SEDIMENT CONTROL <br />7-1 GENERAL <br />7-1.1 DESIGN REQUIREMENTS <br />Design of the Erosion and Sediment Control measures shall comply with the current version of the <br />City of South Bend Stormwater Management Ordinance and the Indiana Stormwater Quality <br />Manual, Issuance of Permits, Construction and Permit Requirements, and product manufacturer’s <br />requirements. <br />7-2 CONSTRUCTION METHODS <br />7-2.1 GENERAL <br />All Erosion and Sediment Control items shall be installed in strict conformance with the <br />manufacturer’s instructions for proprietary items. On-site construction methods shall conform to <br />these Specifications and City of South Bend Standards and the Indiana Stormwater Quality <br />Handbook. <br />A typical layout for Erosion and Sediment Control measures on an individual lot is included in <br />Standard Drawing 7-8. While this will not encompass every situation, it should be used as a <br />guideline when determining which measures to use and where they should be located. <br />Prior to site work, Erosion Control measures shall be installed to control erosion and prevent <br />sediment from exiting the site. This shall include but not be limited to silt fences and filter socks, <br />construction entrances, inlet protection, and other items as necessary to control sediment. <br />Construction operations shall be carried out in a manner so as to minimize erosion and control <br />sediment. Any material excavated from the project shall be contained. <br />A plan shall be submitted to the Division of Engineering for a site that will be inactive for fifth- <br />teen (15) days. This plan shall include the method and schedule for stabilizing the site until work <br />can resume and the original erosion and sediment program can be reimplemented. <br />The Notice of Intent and required rain gauge shall be clearly posted at the site prior to commencing <br />construction activities. <br />7-2.2 INSPECTION AND MAINTENANCE <br />7-2.2 (a) GENERAL <br />Inspection and maintenance of all temporary and permanent measures shall be in accordance <br />with the approved self-monitoring program submitted by the individual lot operator and adhere <br />to Section 7 of the South Bend Standards.
The URL can be used to link to this page
Your browser does not support the video tag.