Laserfiche WebLink
SECTION 3 – STORMWATER <br />39 <br />3.) The video inspection shall begin with a clear identification of the televising location, upstream <br />and downstream manhole designation, and pipe diameter. The DVDs shall provide an accurate <br />length measurement of the entire segment and of the distance to each lateral connection. <br />4.) Televising DVDs shall be submitted to the City Engineer’ representative for review and <br />approval. The DVDs shall be clearly and properly labeled. Inspection for individual sewer <br />segments (manhole to manhole) shall be bookmarked. <br />3-3.4 (c) TEST REPORTING <br />1.) Test reports shall be prepared on official company letterhead and shall include relevant <br />information and documentation for each type of test conducted. The test report is not official <br />unless it is signed by a City Engineer representative. <br />2.) Any main line valves and equipment will be operated and witnessed by a South Bend City <br />Engineer representative. Any installed material that is not functioning properly will result in a <br />failed test. The accuracy of the Record Drawings will be checked at this time. <br />3.) All visible leaks shall be repaired and retested. All pipe, fittings, and other materials found to <br />be defective under test pressure shall be removed and replaced. <br />4.) Deviation from the above test procedures shall not be permitted.