Ms. Gemma Stanton <br />February 13, 2024 <br /> <br />The project scope has been set at the Preliminary Field Check. The additional scoped areas include additional curb <br />ramps, sidewalks, curb and gutters and, storm water structures. The Project Development Process and Review <br />Submittals will be prepared in accordance with IDM 14-2.03 Road Plans, Partial 3R Project. <br /> <br /> <br />Field Survey: <br /> <br />Additional topographic survey will be performed in the additional areas as discussed during the Preliminary <br />Field Check. <br /> <br /> <br />Environmental Document: <br /> <br />Section 106 Documentation pursuant to Minor Projects Programmatic Agreement (MPPA) Section 1. The <br />project will remain a CE-1, if project elements affect the level, they will be removed from the project unless <br />authorized by the city of South Bend. <br /> <br /> <br />Construction Storm Water General Permit: <br /> <br />It is anticipated that ~1.86 acres of disturbance are needed for the reconstruction of the sidewalks and curb <br />ramps. Due to the disturbance exceeding one acre a Construction Storm Water General Permit will be <br />required. <br /> <br /> <br /> <br /> <br />We understand that the project will be a partial 3R project in accordance with IDM 40 and will follow the <br />Resurfacing, Non-Freeway Project Development Process. Based on our experience with projects of similar size and <br />scope and our discussions with your office the following milestones will be included in the scope of work. <br /> <br />• Project Assessment <br />• Field Survey <br />• Utility Coordination <br />• Stage 1 Review Submission <br />• Preliminary Field Check Meeting <br />• Stage 3 Review Submission (INDOT for Time Set) <br />• Tracings <br />• CIB Review <br />• Bid Phase Services <br />• Pre-Construction Conference <br />• Construction Phase Office Services <br /> <br />