My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 1 to PSA - SRTS Muessel & Holy Cross Proj No. 122-006 – The Troyer Group
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 1 to PSA - SRTS Muessel & Holy Cross Proj No. 122-006 – The Troyer Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2024 3:21:38 PM
Creation date
4/23/2024 3:21:31 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
4/23/2024
Text box
ID:
1
Creator:
Created:
4/23/2024 3:21 PM
Modified:
4/23/2024 3:21 PM
Text:
mailto:gstanton@southbendin.gov
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br /> 22031-00 <br /> <br />February 13, 2024 <br /> <br />Gemma Stanton, Project Engineer <br />227 W. Jefferson Blvd <br />South Bend, IN 46601 <br />gstanton@southbendin.gov <br /> <br />RE: RFP Safe Routes to School PE Services <br />Des. No.: 1900447 <br />Muessel Primary & Holy Cross School Area <br /> Amendment No. 1 <br /> <br /> <br />Dear Ms. Stanton: <br /> <br />The Troyer Group (TTG) hereby presents amendment #1 to the City of South Bend for the Safe Routes to School <br />project near the Muessel Primary and Holy Cross Schools neighborhood. <br /> <br /> <br /> <br />We understand that this project is replacement of sidewalks and handicap accessible ramps within the <br />neighborhood. The primary focus being on the primary routes to and from the schools. The sidewalks that will be <br />replaced will be with 5-foot-wide sidewalks from back of existing sidewalks towards the existing curb line. <br />Additional crosswalk striping and signage may be included. <br /> <br /> <br /> <br />The current sidewalks and ADA ramps are not in compliance with current standards. <br /> <br /> <br /> <br />The project is needed to provide a safe route for students walking to and from Muessel Primary and Holy Cross <br />Schools. <br /> <br />The preliminary cost estimate of $1,625,000 for Construction has been reduced to $1,315,938 per Macog’s direction. <br /> <br />The project’s letting has been moved into FY-2025. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.